5 The Terrace Upwood Road Bury Huntingdon PE26 2NG Data via plota.co.uk

26/00203/HHFUL - Householder (Full) Approved

Proposal

Replacement single storey garage with storage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jan 2026
✓
Validated
3 Feb 2026
✓
Consultation
10 Feb 2026
✓
Approved
30 Mar 2026

Approved on 30 Mar 2026 · Delegated · Last checked 7 Jul 2026

Site constraints 3

Also on the record
Conservation area 77 m away: Ramsey and Bury; Inside the Ramsey built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 2, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £182,500 in January 2021. Terraced house, freehold.

27 January 2021£182,500
27 June 2014£135,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area81 m² (872 sq ft)
Energy ratingE (54 out of 100), could reach B
PropertyEnd-terrace house, 5 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in January 2014, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Huntingdonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder (Full)
Postcode
PE26 2NG
Received
30 Jan 2026
Validated
3 Feb 2026
Ward
Ramsey
Parish
Bury
Case officer
Show
Target decision
31 Mar 2026
Decision
Grant Permission to
Decision date
30 Mar 2026
Decision level
Delegated
Applicant
Show

How this decision compares

Decided in 55 days from validation, about the council's usual 56 days. Approved, as 82% of demolitions here are.

52%decided within 8 weeks
82%approved
71decided in the last year

Plota live figures for demolitions decided by Huntingdonshire in the last twelve months, from validation. Huntingdonshire decision record →

Consultation & key dates

Neighbours
10 Feb 2026
Consultation
10 Feb 2026
Comments by
12 Mar 2026
Statutory expiry
31 Mar 2026
Env. assessment
No
Huntingdonshire
Planning Authority Score
3.9/10
Below average
#197 of 296 overall
Relevant to this application:
Householder decisions

Huntingdonshire is slower than most councils at deciding householder applications: #210 of 296 on speed. 55% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Huntingdonshire decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #155 of 296
95%
Householder approved
Above avg (90%) #80 of 296
55%
Decided in 8 weeks
Below avg (63%) #210 of 296
55%
Extended time limit
Above avg (41%) #250 of 296
69%
Minor dwellings approved
175 decided (1-9 homes)
91%
Major dwellings approved
22 decided (10+ homes)
87%
Change of use approved
52 decided
1,077
Total decisions
125 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.