Proposal

Retrospective application for the energy centre south substation at AESC Plant 2 at IAMP. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
10 Nov 2026
✓
Consultation
17 Nov 2026
Decision
Expected by 5 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 5 Jan 2027, from Sunderland's recent full applications.

Comments are open until 8 Dec 2026

Comment on this application ↗

Site constraints 4

National infrastructure project 700 m away: A19 Downhill Lane Junction Improvement
The site is 700 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: A19 / A184 Testos Junction Improvement (decided, 1 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area; Inside the Sunderland built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area13,093 m² (140,932 sq ft)
Energy ratingB (asset rating 39)
UseGeneral Industrial and Special Industrial Groups
HeatingHeating and Mechanical Ventilation

From the energy performance certificate lodged in June 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Sunderland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sunderland
Application type
Full Application (Reg 4)
Postcode
SR5 3FH
Received
10 Nov 2026
Validated
10 Nov 2026
Ward
Washington East
Case officer
Show
Target decision
5 Jan 2027
Applicant
Show
Agent
Lichfields

Decision outlook

Day 13 of the 56-day target. Sunderland usually decides full applications by day 56.

Day 1343 days to the 56-day target
61%decided within 8 weeks
92%approved
6%go to committee

Plota live figures for full applications decided by Sunderland in the last twelve months, from validation. Sunderland decision record →

Public comments

No public comments yet.

4 neighbours consulted · Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15088660
Planning Portal ref
PP-15088660
Neighbours
17 Nov 2026
Consultation
17 Nov 2026
Comments by
8 Dec 2026
Statutory expiry
5 Jan 2027
Env. assessment
No
Sunderland
Planning Authority Score
6.2/10
Average
#94 of 296 overall
Relevant to this application:
Householder decisions

Sunderland is #99 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sunderland decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #101 of 296
94%
Householder approved
Above avg (90%) #119 of 296
73%
Decided in 8 weeks
Above avg (63%) #99 of 296
37%
Extended time limit
Below avg (41%) #123 of 296
85%
Minor dwellings approved
34 decided (1-9 homes)
84%
Major dwellings approved
19 decided (10+ homes)
66%
Change of use approved
58 decided
581
Total decisions
54 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.