Sir Douglas Evill Industrial Park Daedalus Drive Lee-on-the-solent Hampshire Data via plota.co.uk

26/00057/FULL - Devt. app. FULL Registered

Proposal

Redevelopment to include construction of a c.3166 sq.m. Office building (use Class E(g)(I)) and c.7537 sq.m. Employment buildings and service yards (use classes e(g)(III), B2 & B8) with vehicle parking, hardstanding, vehicular and pedestrian accesses onto Daedalus Drive, landscaping and associated works… Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
20 Feb 2026
Consultation
26 Feb 2026
Decision
Expected by 22 May 2026

This application is under consideration - no decision has been issued yet. Plota predicted a decision around 12 Sept 2026; it is now day 204. The consultation period closed on 26 Mar 2026.

Documents 41

Statements & assessments 28

PDF AIR QUALITY ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF AVIATION WILDLIFE HAZARD DESIGN RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL Supporting Document · 20 Feb 2026 View ↗ PDF DRAINAGE MANAGEMENT PLAN Supporting Document · 20 Feb 2026 View ↗ PDF 1 - MAIN DOCUMENT DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 4 - GROUND WATER MONITORING DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 5 - SOUTHERN WATER SEWER PLAN DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 6 - HCC DRAINAGE DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 1 - PROPOSED MASTERPLAN DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 2 - TOPOGRAPHICAL SURVEY DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 3 - UTILITY SURVEY DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 7 - DRAINAGE STRATEGY DRAWINGS DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 7 - DRAINAGE STRATEGY DRAWINGS -2 DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 8 - SURFACE WATER DRAINAGE CALUCATIONS DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 9 - PROPOSED LEVELS DRAWING DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF APPENDIX 9 - PROPOSED LEVELS DRAWING 2 DRAINAGE STRATEGY & FLOOD RISK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF PART 1 LAND CONTAMINATION ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF PART 2 LAND CONTAMINATION ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF BIODIVERSITY METRIC CALCULATION TOOL Supporting Document · 20 Feb 2026 View ↗ PDF ENVIRONMENTAL STATEMENT COMPLIANCE STATEMENT Supporting Document · 20 Feb 2026 View ↗ PDF EXTERNAL IMPACT LIGHTING ASSESSMENT - ZONE1A Supporting Document · 20 Feb 2026 View ↗ PDF NOISE IMPACT ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF INDUSTRIAL UNIT BREEAM PRE-ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF OFFICE BUILDING BREEAM PRE-ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF OUTLINE ENERGY AND SUSTAINABILITY STATEMENT Supporting Document · 20 Feb 2026 View ↗ PDF TRANSPORT ASSESSMENT Supporting Document · 20 Feb 2026 View ↗ PDF PLANNING STATEMENT Supporting Document · 20 Feb 2026 View ↗ PDF HILLSIDE RISK & FRAMEWORK ASSESSMENT Supporting Document · 20 Feb 2026 View ↗

All documents on the council site ↗

Site constraints 7

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Daedalus conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Special protection area 237 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
SSSI 237 m away: Lee-on-The Solent to Itchen Estuary SSSI; 2 listed buildings within 150 m; Inside the Lee-on-the-Solent built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Gosport - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gosport
Application type
Devt. app. FULL
Postcode
PO13 9FX
Received
20 Feb 2026
Validated
20 Feb 2026
Ward
Lee West
Case officer
Show
Target decision
22 May 2026
Applicant
Show
Agent
Freeths LLP

Decision outlook

Day 204, past the statutory target. 100% of tree and landscaping works in Gosport are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 10 Sept 2026.

Day 204148 days past the 56-day target
97%decided within 8 weeks
100%approved
34decided in the last year

Plota live figures for tree and landscaping works decided by Gosport in the last twelve months, from validation. Gosport decision record →

Public comments

1comment received
1 neutral

38 neighbours consulted · Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14665424
Neighbours
26 Feb 2026
Consultation
26 Feb 2026
Comments by
26 Mar 2026
Site or press notice
5 Mar 2026
Statutory expiry
22 May 2026
Env. assessment
No
Gosport
Planning Authority Score
8.3/10
Excellent
#19 of 296 councils
Relevant to this application:
Householder decisions

Gosport is faster than most councils at deciding householder applications, ranking #66 out of 296. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Gosport decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #38 of 296
97%
Householder approved
Above avg (90%) #32 of 296
76%
Decided in 8 weeks
Above avg (63%) #66 of 296
30%
Extended time limit
Below avg (41%) #54 of 296
67%
Minor dwellings approved
18 decided (1-9 homes)
100%
Major dwellings approved
3 decided (10+ homes)
85%
Change of use approved
13 decided
226
Total decisions
13 refused in the year to March 2026