Agricultural Building Rodley Court Rodley Court Road Rodley Gloucestershire Data via plota.co.uk

P0140/26/FUL - Full Application Approved

Proposal

Erection of an extension and roof alterations to agricultural building (mill-and-mix building) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Feb 2026
✓
Validated
11 Feb 2026
✓
Consultation
19 Mar 2026
✓
Approved
1 Apr 2026

Approved on 1 Apr 2026 · Delegated Decision · Last checked 5 Jul 2026

Site constraints 6

2 listed buildings within 150 m of the postcode pin
Nearest: Rodley Court, Grade II, the postcode pin is inside its outline · 2 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 2 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Rodley built-up area; Priority habitat about 15 m away: Traditional orchard; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Forest of Dean - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Application
Postcode
GL14 1RB
Received
5 Feb 2026
Validated
11 Feb 2026
Ward
Westbury-on-Severn
Parish
Westbury On Severn
Case officer
Show
Target decision
8 Apr 2026
Decision
Granted Permission
Decision date
1 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Total Design Ltd

How this decision compares

Decided in 49 days from validation, 6 days slower than Forest of Dean's median of 43 for agricultural works. Approved, as 94% of agricultural works here are.

72%decided within 8 weeks
94%approved
37decided in the last year

Plota live figures for agricultural works decided by Forest of Dean in the last twelve months, from validation. Forest of Dean decision record →

Consultation & key dates

Alt. reference
DF3580
Consultation
19 Mar 2026
Comments by
9 Apr 2026
Site or press notice
3 Mar 2026
Statutory expiry
8 Apr 2026
Env. assessment
No
Forest of Dean
Planning Authority Score
5.7/10
Average
#114 of 296 overall
Relevant to this application:
Householder decisions

Forest of Dean is #149 of 296 councils on householder decision speed. 49% of applications have the time limit extended, above the 41% national average. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Forest of Dean decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #82 of 296
98%
Householder approved
Above avg (90%) #16 of 296
64%
Decided in 8 weeks
Above avg (63%) #149 of 296
49%
Extended time limit
Above avg (41%) #219 of 296
72%
Minor dwellings approved
85 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
9 decided
561
Total decisions
43 refused in the year to March 2026