Valleasha Main Road Sibsey Lincolnshire PE22 0TZ Data via plota.co.uk

00459/26/ABC - Prior Approval - Agricultural/Forestry Approved

Proposal

Determination of whether or not prior approval is required for the siting, design and external appearance of the extension to the agricultural reservoir proposed. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Mar 2026
✓
Consultation
25 Mar 2026
✓
Approved
16 Apr 2026

Approved on 16 Apr 2026 · Delegated Decision · Last checked 5 Jul 2026

Site constraints 2

Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project about 902 m away: Triton Knoll Electrical System
The site is about 902 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Eastern Green Link 3 and Eastern Green Link 4 (at pre-application, the site is inside its boundary); Grimsby to Walpole (at pre-application, about 843 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Prior Approval - Agricultural/Forestry
Postcode
PE22 0TZ
Received
20 Mar 2026
Validated
20 Mar 2026
Ward
Sibsey And Stickney Ward
Parish
Sibsey
Case officer
Show
Target decision
16 Apr 2026
Decision
Not required
Decision date
16 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Robert Doughty Consultancy Limited

How this decision compares

Decided in 27 days from validation, about the council's usual 27 days. Approved, as 95% of agricultural works here are.

78%decided within 8 weeks
95%approved
81decided in the last year

Plota live figures for agricultural works decided by East Lindsey in the last twelve months, from validation. East Lindsey decision record →

Consultation & key dates

Alt. reference
PP-14792544
Planning Portal ref
PP-14792544
Consultation
25 Mar 2026
Comments by
1 Apr 2026
Statutory expiry
16 Apr 2026
Env. assessment
No
East Lindsey
Planning Authority Score
4.5/10
Below average
#171 of 296 councils
Relevant to this application:
Householder decisions

East Lindsey ranks #182 out of 296 councils for householder decision speed. 47% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Lindsey decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #36 of 296
94%
Householder approved
Above avg (90%) #105 of 296
60%
Decided in 8 weeks
Below avg (63%) #182 of 296
47%
Extended time limit
Above avg (41%) #206 of 296
86%
Minor dwellings approved
146 decided (1-9 homes)
100%
Major dwellings approved
24 decided (10+ homes)
95%
Change of use approved
109 decided
817
Total decisions
53 refused in the year to March 2026