Opposite 91 The Esplanade Weymouth DT4 7RN Data via plota.co.uk

P/FUL/2026/00467 - Full Planning Application Approved

Proposal

Erect bandstand and decking Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Jan 2026
✓
Validated
30 Jan 2026
✓
Committee
7 May 2026
✓
Approved
7 May 2026

Approved on 7 May 2026 · Committee · Last checked 13 Jul 2026

Planning committee

Decided by Dorset Western and Southern Area Planning Committee on 7 May 2026.

Approved

As officers recommended.

  • Officers advised approval because the bandstand would provide a community and tourism facility without harming heritage, character or flood risk.
  • Residents raised concerns about funding, antisocial behaviour, sea damage, beach space and maintenance, while others cited economic and heritage benefits.
  • The committee granted permission subject to conditions covering the plans, timing, roof material, paint colour and flood response plan.
Read how the committee decided The proposal, site, planning assessment, public comments and committee decision.

Source: Plota analysis of Dorset's committee minutes of 7 May 2026.

Documents 28

All documents on the council site ↗

Site constraints 7

Grade II listed: Weymouth D-Day Port Memorial
List entry 1393112 · 14 m away · 28 more listed buildings within 150 m (1 Grade II*, 27 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 28 with distances
Historic England ↗
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Rufus Castle to Lulworth Cove across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Weymouth Town Centre Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Heritage at risk: Weymouth Town Centre
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
SSSI 302 m away: Radipole Lake SSSI.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Full Planning Application
Postcode
DT4 7RN
Received
27 Jan 2026
Validated
30 Jan 2026
Ward
Melcombe Regis Ward
Parish
Weymouth
Case officer
Show
Decision
Granted
Decision date
7 May 2026
Decision level
Committee

How this decision compares

Decided in 97 days from validation, 42 days slower than Dorset's median of 55 for community buildings. Approved, as 93% of community buildings here are.

57%decided within 8 weeks
93%approved
7%go to committee

Plota live figures for community buildings decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
16 Mar 2026
Committee
7 May 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026