Laybourne House, Admirals Way, London, E14 Data via plota.co.uk

PA/26/01542/NC - Advertisement Consent Registered

Proposal

Advert reference / name: Advert 1 ? Outdoor LED advertising screen Type: Freestanding digital advertisement (LED screen) Illumination: Internally illuminated digital display Overall size (W x H x D): 880mm x 2180mm x 448mm Display area (if asked): 680mm x 1205mm Colour: Black Materials: Metal enclosure with anti-reflection glass front Height above ground: Base at ground level; overall height 2180mm Projection: N/A (freestanding unit; no projection from building) Fixings / method of installation: Fixed to existing hardstanding using a base plate and anchor bolts / secure fixing in accordance with manufacturer's instructions (details shown on drawings). Operational controls (if asked): No audio; no flashing; timer controlled (e.g. 07:00?23:00); brightness controlled to avoid glare; content changes set to avoid distraction. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Sept 2026
✓
Consultation
9 Sept 2026
Decision
Expected by 29 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 29 Oct 2026, from Tower Hamlets's recent signs and adverts.

The consultation period closed on 30 Sept 2026.

Site constraints 9

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Canary Wharf. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: Tower Hamlets APA 3.1
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 117 m away: Thames Tideway Tunnel
The site is 117 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: Silvertown Tunnel (decided, 1515 m); London Strategic Heat Main Project (at pre-application, 1883 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; Town centre 98 m away: Canary Wharf.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Advertisement Consent
Received
3 Sept 2026
Validated
3 Sept 2026
Ward
Canary Wharf
Case officer
Show
Target decision
29 Oct 2026
Decision level
Delegated
Applicant
Show
Agent
NUMBER SEVEN FOOD TECHNOLOGY LIMITED

Decision outlook

Day 36 of the 56-day target. Tower Hamlets usually decides signs and adverts by day 56.

Day 3620 days to the 56-day target
67%decided within 8 weeks
85%approved
84decided in the last year

Plota live figures for signs and adverts decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
9 Sept 2026
Consultation
9 Sept 2026
Comments by
30 Sept 2026
Statutory expiry
29 Oct 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Other decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026