Ralph's Wood And Summerhouse Plantation Lawton Hall Drive, Church Lawton, Cheshire East Data via plota.co.uk

26/3632/TPO - Works to TPO Trees Pending Consideration

Proposal

To remove as many seedlings and saplings of beech and sycamore maple from the woodland as possible to avoid the native species being completely overrun. Beech and sycamore are both introduced species, produce seed freely and generate many seedlings every year which outcompete the naturally occurring oak, birch, ash etc. In order to restore the balance of native tree species the number of young beech and sycamore trees must be reduced. All beech and sycamore to be removed are seedlings, saplings and small trees of less than 8cms diameter @ 1.3m height. The seedlings can be pulled up by the root whereas the saplings and young trees will be cut down. All of the trees to be removed are within the Ralph's Wood and Summerhouse Plantation areas of the TPO map. None are listed individually on the TPO schedule, but some are growing within the area of the group denoted as W5 and they are all within the continuous black line on the map. Trees to be felled will be paint-marked by an X. They will be replaced by seedlings of native broadleaf species with a spacing of approximately 2.5m apart. The trees will be recruited from a list including hazel, hawthorn, field maple, rowan, crab apple, birch, alder and crack willow, goat willow, white willow etc. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Oct 2026
✓
Validated
12 Oct 2026
Decision
Expected by 7 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 3 Dec 2026 and 18 Dec 2026, from Cheshire East's recent tree and landscaping works.

Site constraints 8

Ancient woodland: Mill Lane and Summerhouse Plantation
Irreplaceable habitat. Standing advice asks for a 15 m buffer from the boundary.
National policy refuses development that would cause loss or deterioration of ancient woodland or ancient trees unless there are wholly exceptional reasons.
Green belt: Stoke-on-Trent
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Priority habitat: Deciduous woodland
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Public footpath 17 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Ancient Semi Natural Woodland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Coalfield, development low risk area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cheshire East - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to TPO Trees
Received
6 Oct 2026
Validated
12 Oct 2026
Ward
Odd Rode
Parish
Odd Rode
Case officer
Show
Target decision
7 Dec 2026
Decision level
Delegation
Applicant
Show

Decision outlook

Day 44 of the 56-day target. Cheshire East usually decides tree and landscaping works by day 57.

Day 4413 days to the predicted decision (day 57)
50%decided within 8 weeks
96%approved
652decided in the last year

Plota live figures for tree and landscaping works decided by Cheshire East in the last twelve months, from validation. Cheshire East decision record →

Consultation & key dates

Statutory expiry
7 Dec 2026
Cheshire East
Planning Authority Score
1.9/10
Poor
#274 of 296 overall
Relevant to this application:
Householder decisions

Cheshire East is one of the slowest councils in England for householder decisions: #268 of 296 on speed. The council extends the time limit on 65% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cheshire East decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #168 of 296
91%
Householder approved
Above avg (90%) #170 of 296
39%
Decided in 8 weeks
Below avg (63%) #268 of 296
65%
Extended time limit
Above avg (41%) #279 of 296
72%
Minor dwellings approved
358 decided (1-9 homes)
76%
Major dwellings approved
25 decided (10+ homes)
79%
Change of use approved
119 decided
2,513
Total decisions
321 refused in the year to March 2026