25 - 30 North Row London W1K 6DJ Data via plota.co.uk

25/00417/FULL - Full Planning Permission Application Withdrawn

Proposal

Refurbishment of existing Class E floorspace, changes to the ground floor frontage and entrance arrangement, introduction of a mezzanine level at lower ground level, creation of terraced amenity spaces on the ground floor, second floor and roof level and construction of a roof extension [amended plans]. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Jan 2025
✓
Consultation
27 Mar 2025
−
Withdrawn
13 May 2025

Withdrawn on 13 May 2025 · Last checked 10 Nov 2026

Planning committee

Deferred by Westminster Planning Sub-Committee (2) on 4 Aug 2026.

Deferred unanimously

  • Officers advised approval because the development was considered acceptable, subject to conditions.
  • Residents and WUK Propco Limited made additional and late representations.
  • The committee voted unanimously to defer the application so more time could be allowed for representations.
Read how the committee decided The proposed works, officers’ assessment, local representations and the committee’s decision to defer determination.

Source: Plota analysis of Westminster's committee minutes of 4 Aug 2026.

Documents 83

Statements & assessments 19

PDF DESIGN AND ACCESS STATEMENT ADDENDUM Design and Access Statement · 25 Mar 2025 View ↗ PDF SUSTAINABLE DESIGN STATEMENT Background Papers · 4 Feb 2025 View ↗ PDF PLANNING STATEMENT Background Papers · 4 Feb 2025 View ↗ PDF PLANNING STATEMENT Planning Statement · 22 Jan 2025 View ↗ PDF HERITAGE, TOWNSCAPE AND VISUAL IMPACT ASSESSMENT Heritage Statement · 22 Jan 2025 View ↗ PDF SUSTAINABLE DESIGN STATEMENT Background Papers · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 12 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 1 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 2 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 3 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 4 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 5 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 6 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 7 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 8 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 9 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 10 Design and Access Statement · 22 Jan 2025 View ↗ PDF DESIGN AND ACCESS STATEMENT PART 11 Design and Access Statement · 22 Jan 2025 View ↗ PDF FIRE STATEMENT Background Papers · 22 Jan 2025 View ↗

Plans & drawings 42

PDF PROPOSED PLAN - LEVEL 06 Drawing · 25 Mar 2025 View ↗ PDF PROPOSED PLAN - LEVEL 02 Drawing · 25 Mar 2025 View ↗ PDF PROPOSED PLAN - LEVEL 00 Drawing · 25 Mar 2025 View ↗ PDF PROPOSED SECTION ? AA Drawing · 25 Mar 2025 View ↗ PDF PROPOSED ELEVATION BAY STUDIES Drawing · 25 Mar 2025 View ↗ PDF PROPOSED ELEVATION - WEST Drawing · 25 Mar 2025 View ↗ PDF PROPOSED ELEVATION - EAST Drawing · 25 Mar 2025 View ↗ PDF PROPOSED ELEVATION - SOUTH Drawing · 25 Mar 2025 View ↗ PDF PROPOSED ELEVATION - NORTH Drawing · 25 Mar 2025 View ↗ PDF PROPOSED ELEVATION - NORTH Superseded document · 22 Jan 2025 View ↗ PDF PROPOSED ELEVATION - SOUTH Superseded document · 22 Jan 2025 View ↗ PDF PROPOSED ELEVATION - EAST Superseded document · 22 Jan 2025 View ↗ PDF PROPOSED ELEVATION - WEST Superseded document · 22 Jan 2025 View ↗ PDF PROPOSED ELEVATION BAY STUDIES Superseded document · 22 Jan 2025 View ↗ PDF PROPOSED SECTION - AA Superseded document · 22 Jan 2025 View ↗ PDF PROPOSED SECTION - BB Drawing · 22 Jan 2025 View ↗ PDF PROPOSED PLAN - LEVEL 00 Superseded document · 22 Jan 2025 View ↗ PDF PROPOSED PLAN - LEVEL 01 Drawing · 22 Jan 2025 View ↗ PDF PROPOSED PLAN - LEVEL 02 Superseded document · 22 Jan 2025 View ↗ PDF PROPOSED PLAN - LEVEL 03 Drawing · 22 Jan 2025 View ↗ PDF PROPOSED PLAN - LEVEL 04 Drawing · 22 Jan 2025 View ↗ PDF PROPOSED PLAN - LEVEL 05 Drawing · 22 Jan 2025 View ↗ PDF PROPOSED PLAN - LEVEL 06 Superseded document · 22 Jan 2025 View ↗ PDF PROPOSED PLAN - LEVEL B1 Drawing · 22 Jan 2025 View ↗ PDF PROPOSED ROOF PLAN Drawing · 22 Jan 2025 View ↗ PDF EXISTING ELEVATION - NORTH Drawing · 22 Jan 2025 View ↗ PDF EXISTING ELEVATION - SOUTH Drawing · 22 Jan 2025 View ↗ PDF EXISTING ELEVATION - EAST Drawing · 22 Jan 2025 View ↗ PDF EXISTING ELEVATION - WEST Drawing · 22 Jan 2025 View ↗ PDF EXISTING ELEVATION BAY STUDIES Drawing · 22 Jan 2025 View ↗ PDF EXISTING SECTION - AA Drawing · 22 Jan 2025 View ↗ PDF EXISTING SECTION - BB Drawing · 22 Jan 2025 View ↗ PDF EXISTING PLAN - LEVEL 00 Drawing · 22 Jan 2025 View ↗ PDF EXISTING PLAN - LEVEL 01 Drawing · 22 Jan 2025 View ↗ PDF EXISTING PLAN - LEVEL 02 Drawing · 22 Jan 2025 View ↗ PDF EXISTING PLAN - LEVEL 03 Drawing · 22 Jan 2025 View ↗ PDF EXISTING PLAN - LEVEL 04 Drawing · 22 Jan 2025 View ↗ PDF EXISTING PLAN - LEVEL 05 Drawing · 22 Jan 2025 View ↗ PDF EXISTING PLAN - LEVEL B1 Drawing · 22 Jan 2025 View ↗ PDF EXISTING PLAN - ROOF LEVEL Drawing · 22 Jan 2025 View ↗ PDF EXISTING PLAN - SITE LOCATION Location Plan · 22 Jan 2025 View ↗ PDF EXISTING PLAN - SITE Drawing · 22 Jan 2025 View ↗

All documents on the council site ↗

Site constraints 11

Mayfair conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Article 4 Basement Development Permitted Rights Removed. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: City of Westminster APA 2.5
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
12 listed buildings within 150 m
Nearest: 10, Green Street W1, Grade II, 23 m away · 1 Grade I, 3 Grade II*, 8 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 12 with distances
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Also on the record
National infrastructure project 1834 m away: Thames Tideway Tunnel; Registered park or garden 214 m away: Grosvenor Square; Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Town centre 5 m away: West End.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 9 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area2,737 m² (29,461 sq ft)
Energy ratingB (asset rating 41)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in October 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
W1K 6DJ
Received
22 Jan 2025
Validated
22 Jan 2025
Ward
West End
Case officer
Show
Target decision
30 Apr 2025
Decision
Application Withdrawn
Decision date
13 May 2025
Applicant
Show
Agent
Iceni Projects

Public comments

1comment received
1 objecting

151 neighbours consulted · Last counted 10 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-13685398
Planning Portal ref
PP-13685398
Comments by
30 Apr 2025
Site or press notice
27 Mar 2025
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.