32A Hackington Road Tyler Hill Kent CT2 9NQ Data via plota.co.uk

CA/26/00405 - Full Application Approved

Proposal

Two-storey and single-storey rear extension together with addition of front porch. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Mar 2026
✓
Approved
27 Apr 2026

Approved on 27 Apr 2026 · Delegated Decision · Last checked 6 Jul 2026

Site constraints 10

Nutrient neutrality catchment: Stodmarsh SAC/SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
the Tyler Hill Conservation Area. Registered 27.03.1995 conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Canterbury and surrounding area. Dated 25.02.2015 effective 25.02.2016. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 114 m away: West Blean and Thornden Woods SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Local nature reserve 296 m away: Tyler Hill Meadow
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
2 listed buildings within 150 m; National infrastructure project 1.9 km away: Richborough Connection Project; Inside the Tyler Hill built-up area; Priority habitat 25 m away: No main habitat but additional habitats present.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area116 m² (1,249 sq ft)
Energy ratingD (67 out of 100), could reach C
PropertyDetached house, 6 habitable rooms
Built1967 to 1975
HeatingBoiler and radiators, mains gas
WallsCavity wall, filled cavity

From the energy performance certificate lodged in December 2023, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Canterbury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Canterbury
Application type
Full Application
Postcode
CT2 9NQ
Received
13 Mar 2026
Validated
13 Mar 2026
Ward
Blean Forest
Parish
Hackington
Case officer
Show
Target decision
8 May 2026
Decision
GRANTED
Decision date
27 Apr 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Planning Geek

How this decision compares

Decided in 45 days from validation, 10 days faster than Canterbury's median of 55 for extensions. Approved, as 98% of extensions here are.

70%decided within 8 weeks
98%approved
487decided in the last year

Plota live figures for extensions decided by Canterbury in the last twelve months, from validation. Canterbury decision record →

Consultation & key dates

Site or press notice
20 Mar 2026
Statutory expiry
8 May 2026
Canterbury
Planning Authority Score
4.8/10
Below average
#158 of 296 overall
Relevant to this application:
Householder decisions

Canterbury is slower than most councils at deciding householder applications: #259 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Canterbury decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #18 of 296
97%
Householder approved
Above avg (90%) #27 of 296
43%
Decided in 8 weeks
Below avg (63%) #259 of 296
44%
Extended time limit
Above avg (41%) #176 of 296
84%
Minor dwellings approved
62 decided (1-9 homes)
95%
Major dwellings approved
20 decided (10+ homes)
93%
Change of use approved
29 decided
925
Total decisions
45 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.