3 Mortimer Road Bristol BS8 4EX Data via plota.co.uk

25/15224/H - Full Planning (Householders) Refused

Proposal

Creation of dropped kerb with installation of permeable driveway and removal of front boundary wall. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Dec 2025
✓
Validated
5 Jan 2026
✗
Refused
3 Mar 2026
Appeal
Not lodged

Refused on 3 Mar 2026 · Delegated Decision · Last checked 7 Jul 2026

Site constraints 8

Clifton conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Clifton Ward (1999 ward boundary). Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
20 listed buildings within 150 m of the postcode pin
Nearest: Numbers 1 to 14 (Consecutive) Royal Promenade and Attached Front Basement Railings, Grade II*, about 33 m from the postcode pin · 3 Grade II*, 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 20 with distances
Historic England ↗
National infrastructure project about 751 m away: Portishead Branch Line - MetroWest Phase 1
The site is about 751 m from the project boundary. Railway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
SSSI about 449 m away: Avon Gorge SSSI; Inside the Bristol built-up area; Heritage at risk about 87 m away: Mortimer House, Clifton Down Road, Bristol.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bristol - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bristol
Application type
Full Planning (Householders)
Postcode
BS8 4EX
Received
2 Dec 2025
Validated
5 Jan 2026
Ward
Clifton
Parish
Central, Clifton And Harbourside
Target decision
2 Mar 2026
Decision
REFUSED
Decision date
3 Mar 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Architect Designs

How this decision compares

Decided in 57 days from validation, 8 days slower than Bristol's median of 49 for extensions. Refused, as 14% of extensions here are.

78%decided within 8 weeks
86%approved
1,379decided in the last year

Plota live figures for extensions decided by Bristol in the last twelve months, from validation. Bristol decision record →

Consultation & key dates

Alt. reference
PP-14512769
Planning Portal ref
PP-14512769
Comments by
24 Feb 2026
Statutory expiry
2 Mar 2026
Bristol
Planning Authority Score
5.8/10
Average
#109 of 296 councils
Relevant to this application:
Householder decisions

Bristol ranks #112 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Bristol decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #190 of 296
92%
Householder approved
Above avg (90%) #149 of 296
71%
Decided in 8 weeks
Above avg (63%) #112 of 296
37%
Extended time limit
Below avg (41%) #118 of 296
74%
Minor dwellings approved
374 decided (1-9 homes)
93%
Major dwellings approved
30 decided (10+ homes)
82%
Change of use approved
150 decided
2,098
Total decisions
293 refused in the year to March 2026