Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE Data via plota.co.uk

Proposal

Change of use of grade II listed building to café with exhibition, events, workshop and office spaces together with demolition of existing two storey rear extension and erection of new three storey rear extension with roof terrace and basement, landscaping works and associated restoration works to building including installation of front door, timber sash windows and heat pump system Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
4 Mar 2026
✓
Validated
11 Mar 2026
✓
Consultation
8 Jun 2026
✓
Committee
9 Jul 2026
✓
Approved
14 Aug 2026

Approved on 14 Aug 2026 · Committee Decision · Last checked 19 Aug 2026

Planning committee

Decided by Bolton Planning Committee on 9 Jul 2026.

Approved

As officers recommended.

  • Officers advised approval because the public benefits outweighed Green Belt and heritage harm, subject to conditions.
  • No statutory or non-statutory consultees objected, and no third-party representations were received.
Read how the committee decided The proposal, site history, officers’ assessment, consultation, planning balance, vote and decision.

Source: Plota analysis of Bolton's committee minutes of 9 Jul 2026.

Documents 148

Statements & assessments 21

PDF PRELIMINARY ECOLOGICAL APPRAISAL Ecological Assessment · 8 Jul 2026 View ↗ PDF Energy and Carbon Proforma Other · 19 Jun 2026 View ↗ PDF Energy and Carbon Proforma Other · 19 Jun 2026 View ↗ PDF CARBON & ENERGY STATEMENT Other · 19 Jun 2026 View ↗ PDF Pollution control noise Consultee Comment · 12 Jun 2026 View ↗ PDF Bat Survey Report Ecological Assessment · 8 Jun 2026 View ↗ PDF Preliminary Ecological Appraisal Ecological Assessment · 8 Jun 2026 View ↗ PDF Response to heritage comments Other · 21 May 2026 View ↗ PDF . Flood Risk Team. Consultee Comment · 23 Mar 2026 View ↗ PDF FLOOD RISK ASSESSMENT Application Submission Details · 12 Mar 2026 View ↗ PDF DRAINAGE PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF BNG METRIC Application Submission Details · 5 Mar 2026 View ↗ PDF PLANNING STATEMENT Application Submission Details · 4 Mar 2026 View ↗ PDF HERITAGE IMPACT ASSESSMENT Application Submission Details · 4 Mar 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT 01 Application Submission Details · 4 Mar 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT 02 Application Submission Details · 4 Mar 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT 03 Application Submission Details · 4 Mar 2026 View ↗ PDF DESIGN AND ACCESS STATEMENT 04 Application Submission Details · 4 Mar 2026 View ↗ PDF ARBORICULTURAL IMPACT ASSESSMENT Application Submission Details · 4 Mar 2026 View ↗ PDF BNG REPORT Application Submission Details · 4 Mar 2026 View ↗ PDF PRELIMINARY ECOLOGY APPRAISAL Application Submission Details · 4 Mar 2026 View ↗

Plans & drawings 97

PDF PROPOSED NORTH ELEVATION Other · 19 Jun 2026 View ↗ PDF Proposed Roof Plan Other · 19 Jun 2026 View ↗ PDF Proposed South Elevation Other · 19 Jun 2026 View ↗ PDF Proposed West Elevation Other · 19 Jun 2026 View ↗ PDF Proposed Basement Plan Other · 19 Jun 2026 View ↗ PDF Proposed East Elevation 1 Other · 19 Jun 2026 View ↗ PDF Proposed East Elevation 2 Other · 19 Jun 2026 View ↗ PDF Proposed Section 1 Other · 19 Jun 2026 View ↗ PDF Proposed Section 2 Other · 19 Jun 2026 View ↗ PDF Proposed Section 3 Other · 19 Jun 2026 View ↗ PDF Proposed Section 4 Other · 19 Jun 2026 View ↗ PDF Proposed Section 5 Other · 19 Jun 2026 View ↗ PDF Proposed Section 6 Other · 19 Jun 2026 View ↗ PDF ROCK HALL BUSINESS PLAN Other · 9 Jun 2026 View ↗ PDF ROCK HALL ACTIVITY PLAN Other · 9 Jun 2026 View ↗
PDF Commenter’s name hidden Show Other · 12 Mar 2026 View ↗
PDF STRUCTURAL COLUMN PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED SECTIONS 06 Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING SECTIONS 06 Amended Drawing · 11 Mar 2026 View ↗ PDF DEMO-ALTERATIONS SECTIONS 06 Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED SECTIONS 05 Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING SECTIONS 05 Amended Drawing · 11 Mar 2026 View ↗ PDF DEMO ALTERATIONS SECTIONS 05 Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED SECTIONS 04 Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING SECTIONS 04 Amended Drawing · 11 Mar 2026 View ↗ PDF DEMO ALTERATIONS SECTIONS 04 Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED SECTIONS 03 Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING SECTIONS 03 Amended Drawing · 11 Mar 2026 View ↗ PDF DEMO ALTERATIONS SECTIONS 03 Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED SECTIONS 02 Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING SECTIONS 02 Amended Drawing · 11 Mar 2026 View ↗ PDF DEMO ALTERATIONS SECTIONS 02 Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED SECTIONS 01 Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING SECTIONS 01 Amended Drawing · 11 Mar 2026 View ↗ PDF DEMO ALTERATIONS SECTIONS 01 Amended Drawing · 11 Mar 2026 View ↗ PDF REMEDIAL WORKS Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED KEYNOTES SCHEDULE Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED WEST ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED SOUTH ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED GF ELECTICAL SERVICES Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED ELECTRICAL SERVICES BASEMENT FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED SITE PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED ROOF PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED ROOF DECK FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED ROOF DECJ CEILING PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED NORTH ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED LIGHTING AND FIRE GROUND FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED LIGHTING AND FIRE BASEMENT FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED M&E LANDSCAPE PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED KLARGESTER SERVICES Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED HEATING LAYOUT - GROUND FLOOR Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED HEATING LAYOUT - BASEMENT FLOOR Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED HEATING AND VENTILATION ROOF PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED HEATING AND VENTILATION BASEMENT PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED HEATING AND VENTILATION ROOF DECK PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED HEATING AND VENTILATION GROUND FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED HEATING AND VENTILATION FIRST FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED GROUND FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED GROUND FLOOR CEILING PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED FLOOR TYPES Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED FIRST FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED FIRST FLOOR CEILING PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED EAST ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED EAST ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED DOMESTIC SERVICES ROOF DECK PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED BASEMENT PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PROPOSED BASEMENT CEILING PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF PARK SITE PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF LOCATION PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF FABRIC REPAIRS - WEST AND EAST ELEVATIONS Amended Drawing · 11 Mar 2026 View ↗ PDF FABRIC REPAIRS - SOUTH ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF FABRIC REPAIRS SCHEUDLE Amended Drawing · 11 Mar 2026 View ↗ PDF FABRIC REPAIRS NORTH ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF FABRIC REPAIRS INTERNAL COVING Amended Drawing · 11 Mar 2026 View ↗ PDF FABRIC REPAIRS EXTERNAL CORNICE Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING WEST ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING SOUTH ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING SITE PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING ROOF PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING NORTH ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING MECHANICAL AND ELECTRICAL BASEMENT PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING GROUND FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING FIRST FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING EAST ELEVATION Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING EAST ELEVATION - BOUNDARY WALL Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING BUILDING - REPLACEMENT WINDOWS Amended Drawing · 11 Mar 2026 View ↗ PDF EXISTING BASEMENT PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF ALTERATIONS ROOF PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF ALTERATIONS GROUND FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF ALTERATIONS GROUND FLOOR - REFLECTED CEILING PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF ALTERATIONS FIRST FLOOR PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF ALTERATIONS FIRST FLOOR PLAN - REFLECTED CEILING PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF ALTERATIONS BASEMENT PLAN - REFLECTED CEILING PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF ALTERATIONS BASEMENT PLAN Amended Drawing · 11 Mar 2026 View ↗ PDF LANDSCAPE GA PLAN Application Submission Details · 4 Mar 2026 View ↗ PDF HARD LANDSCAPING PLAN Application Submission Details · 4 Mar 2026 View ↗ PDF SOFT LANDSCAPING PLAN Application Submission Details · 4 Mar 2026 View ↗

All documents on the council site ↗

Site constraints 3

Local nature reserve about 137 m away: Moses Gate
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
Inside the Farnworth built-up area; Air quality management area about 66 m away: Bolton AQMA.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bolton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bolton
Application type
Full Planning Permission
Postcode
BL4 7QE
Received
4 Mar 2026
Validated
11 Mar 2026
Ward
Farnworth North
Case officer
Show
Target decision
6 May 2026
Decision
Approve subject to conditions
Decision date
14 Aug 2026
Decision level
Committee Decision
Applicant
Show
Agent
Buttress

How this decision compares

Decided in 156 days from validation, 100 days slower than Bolton's median of 56 for changes of use. Approved, as 59% of changes of use here are.

60%decided within 8 weeks
59%approved
100decided in the last year

Plota live figures for changes of use decided by Bolton in the last twelve months, from validation. Bolton decision record →

Public comments

No public comments yet.

63 neighbours consulted · Last counted 19 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14270306
Neighbours
12 Mar 2026
Consultation
8 Jun 2026
Comments by
9 Jun 2026
Site or press notice
12 Mar 2026
Committee
9 Jul 2026
Env. assessment
No
Bolton
Planning Authority Score
2.5/10
Poor
#250 of 296 councils
Relevant to this application:
Change of use

Bolton is slower than most councils at deciding householder applications, ranking #229 out of 296. Bolton is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.

One of the strictest councils
only 83% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bolton decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #263 of 296
83%
Householder approved
Below avg (90%) #259 of 296
51%
Decided in 8 weeks
Below avg (63%) #229 of 296
44%
Extended time limit
Above avg (41%) #175 of 296
63%
Minor dwellings approved
70 decided (1-9 homes)
83%
Major dwellings approved
12 decided (10+ homes)
62%
Change of use approved
113 decided
996
Total decisions
208 refused in the year to March 2026