1 Gunsite Thorpe Road Aldeburgh Suffolk IP15 5BH Data via plota.co.uk

DC/26/3216/TCA - Works to Trees in Conservation Area Awaiting decision

Proposal

1no. Sycamore (T2 on plan) - Fell Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
Decision
Expected by 23 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 22 Oct 2026, from East Suffolk's recent tree and landscaping works.

Site constraints 10

Local nature reserve: The Haven, Aldeburgh
Internationally or nationally protected for its wildlife. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI: Leiston - Aldeburgh SSSI
Natural England must be consulted on work that may affect it.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Suffolk Coast & Heaths National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Aldeburgh to Hopton on Sea across the site
Matters where it crosses or adjoins the site; the route and its margin are protected.
Priority habitat: Coastal vegetated shingle
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Heritage coast: Suffolk
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Agricultural land, grade 3a
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 46 m away: Sea Link
The site is 46 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: East Anglia ONE North Offshore Windfarm (decided, 1480 m); East Anglia TWO Offshore Windfarm (decided, 1480 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Coastal vegetated shingle
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Trees in Conservation Area
Postcode
IP15 5BH
Received
11 Sept 2026
Validated
11 Sept 2026
Ward
Aldeburgh And Leiston
Parish
Aldeburgh
Case officer
Show
Target decision
23 Oct 2026
Applicant
Show
Agent
Treeology Services Ltd

Decision outlook

Day 28 of the 56-day target. East Suffolk usually decides tree and landscaping works by day 41.

Day 2828 days to the 56-day target
95%decided within 8 weeks
100%approved
334decided in the last year

Plota live figures for tree and landscaping works decided by East Suffolk in the last twelve months, from validation. East Suffolk decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
23 Oct 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 councils
Relevant to this application:
Other decisions

East Suffolk ranks #183 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions