Moortown Farm, Hampshire Hatches Lane, Moortown, Ringwood BH24 3AT Data via plota.co.uk

26/10821 - Full Planning Permission Registered

Proposal

Siting of a mobile home for use as a rural workers dwelling for a temporary period of up to 3 years (Retrospective). Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
24 Aug 2026
Consultation
25 Aug 2026
Decision
Expected by 19 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision between 19 Oct 2026 and 30 Oct 2026, from New Forest (District)'s recent new homes. Comments are open until 18 Sept 2026.

Comment on this application ↗

Site constraints 8

Green belt: South West Hampshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm.
Nutrient neutrality catchment: River Avon SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Special area of conservation 162 m away: Avon Valley
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI 162 m away: Avon Valley (Bickton to Christchurch) SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Inside the Ringwood built-up area; Priority habitat 12 m away: Coastal and floodplain grazing marsh; the 1970s provisional farmland map had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No listed building at the site · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (District) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
BH24 3AT
Received
24 Aug 2026
Validated
24 Aug 2026
Ward
Ringwood South
Parish
Ringwood
Case officer
Show
Target decision
19 Oct 2026
Applicant
Show
Agent
Stags

Decision outlook

Day 21 of the 56-day target. New Forest (District) usually decides new homes by day 63.

Day 2142 days to the predicted decision (day 63)
43%decided within 8 weeks
49%approved
6%go to committee

Plota live figures for new homes decided by New Forest (District) in the last twelve months, from validation. New Forest (District) decision record →

Public comments

No public comments yet.

Last counted 8 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15176710
Consultation
25 Aug 2026
Comments by
18 Sept 2026
Env. assessment
No
New Forest (District)
Planning Authority Score
7.8/10
Good
#29 of 296 councils
Relevant to this application:
Householder decisions

New Forest (District) is faster than most councils at deciding householder applications, ranking #37 out of 296. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (District) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #112 of 296
96%
Householder approved
Above avg (90%) #54 of 296
80%
Decided in 8 weeks
Above avg (63%) #37 of 296
35%
Extended time limit
Below avg (41%) #103 of 296
69%
Minor dwellings approved
87 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
78%
Change of use approved
40 decided
885
Total decisions
85 refused in the year to March 2026