25/00703/MFL - Major - Full Approved

Proposal

Proposed Battery Energy Storage System (BESS) with an import/export capacity of up to 50MW and including associated infrastructure, engineering works, drainage, cabling, landscaping and access (Major Development/Affecting Public Rights of Way) (Amended Title) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Aug 2025
✓
Consultation
27 Nov 2025
✓
Approved
11 Dec 2025

Approved on 11 Dec 2025 · Committee · Last checked 14 Oct 2026

Planning committee

Decided by North East Derbyshire Planning Committee on 9 Dec 2025.

Approved

As officers recommended.

  • Officers advised approval because energy, biodiversity and other benefits outweighed limited landscape, heritage and agricultural harm.
  • Residents and the parish council raised concerns about fire safety, noise, traffic, ecology, landscape, consultation and local benefits.
  • The committee voted to approve the application subject to conditions and delegated the final wording to the planning manager.
Read how the committee decided The proposal, site, officer assessment, consultation responses, speakers, committee debate, vote and decision.

Source: Plota analysis of North East Derbyshire's committee minutes of 9 Dec 2025.

Documents 55

Plans & drawings 32

PDF AMENDED LANDSCAPING PROPOSALS Revised Drawing · 28 Oct 2025 View ↗ PDF PROPOSED ACCESS SPA - REV B Revised Drawing · 10 Oct 2025 View ↗ PDF PROPOSED TEMPORARY WAITING RESTRICTIONS - REV B Revised Drawing · 10 Oct 2025 View ↗ PDF PROPOSED ACCESS TRACK AND PROW PLAN - REV B Revised Drawing · 10 Oct 2025 View ↗ PDF PROPOSED ACCESS VISIBILITY SPLAYS - REV B Revised Drawing · 10 Oct 2025 View ↗ PDF PROPOSED ACCESS PRELIMINARY DESIGN - REV B Revised Drawing · 10 Oct 2025 View ↗ PDF 132KV SUBSTATION (PLAN) Drawing · 25 Aug 2025 View ↗ PDF 132KV SUBSTATION (SECTION) Drawing · 25 Aug 2025 View ↗ PDF BESS BATTERY UNIT Drawing · 25 Aug 2025 View ↗ PDF TRANSFORMER Drawing · 25 Aug 2025 View ↗ PDF INVERTER Drawing · 25 Aug 2025 View ↗ PDF AUX TRANSFORMER Drawing · 25 Aug 2025 View ↗ PDF DNO CONTROL ROOM Drawing · 25 Aug 2025 View ↗ PDF PROJECT CONTROL ROOM Drawing · 25 Aug 2025 View ↗ PDF 20FT SPARES CONTAINER Drawing · 25 Aug 2025 View ↗ PDF 120 000L WATER TANK Drawing · 25 Aug 2025 View ↗ PDF CCTV CAMERA Drawing · 25 Aug 2025 View ↗ PDF PERIMETER FENCE AND GATE Drawing · 25 Aug 2025 View ↗ PDF CONTEXTUAL ELEVATIONS (SHEET 1 OF 2) Drawing · 25 Aug 2025 View ↗ PDF CONTEXTUAL ELEVATIONS (SHEET 2 OF 2) Drawing · 25 Aug 2025 View ↗ PDF CUT AND FILL ANALYSIS (SHEET 1 OF 2) Drawing · 25 Aug 2025 View ↗ PDF CUT AND FILL ANALYSIS (SHEET 2 OF 2) Drawing · 25 Aug 2025 View ↗ PDF SITE LOCATION PLAN Drawing · 25 Aug 2025 View ↗ PDF PHASE 1 - APPENDIX D ? HISTORICAL PLANS Supporting Document · 25 Aug 2025 View ↗ PDF PHASE 1 - APPENDIX D ? HISTORICAL PLANS Supporting Document · 25 Aug 2025 View ↗ PDF PHASE 1 - APPENDIX D ? HISTORICAL PLANS Supporting Document · 25 Aug 2025 View ↗ PDF EXISTING SITE LAYOUT PLAN Drawing · 25 Aug 2025 View ↗ PDF PROPOSED SITE LAYOUT PLAN Drawing · 25 Aug 2025 View ↗ PDF PROPOSED SITE LAYOUT PLAN IN CONTEXT Drawing · 25 Aug 2025 View ↗ PDF PROPOSED SITE LAYOUT PLAN (TOPO OVERLAY) Drawing · 25 Aug 2025 View ↗ PDF LANDSCAPE PROPOSALS PLAN Superseded Drawing · 25 Aug 2025 View ↗ PDF ACCESS TRACK Superseded Drawing · 25 Aug 2025 View ↗

All documents on the council site ↗

Site constraints 5

Also on the record
Radon affected area, class 3; National infrastructure project about 28 m away: Chesterfield to Willington, at pre-application; Coalfield, development low risk area; Inside the Pilsley built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for battery storage?

Plota Sites searches every land parcel in England and Wales: 9,119 sites fit this search. On and off the market, free to search.

Land for battery storage
Work with planning data?

Every application in North East Derbyshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Major - Full
Postcode
S45 8HN
Received
26 Aug 2025
Validated
26 Aug 2025
Ward
Pilsley And Morton Ward
Parish
Pilsley Parish
Case officer
Show
Target decision
12 Dec 2025
Decision
CONDITIONALLY APPROVED
Decision date
11 Dec 2025
Decision level
Committee
Applicant
Show

How this decision compares

Decided in 107 days from validation, about the council's usual 104 days. Approved, as 88% of full applications here are.

22%decided within 8 weeks
88%approved
118decided in the last year

Plota live figures for full applications decided by North East Derbyshire in the last twelve months, from validation. North East Derbyshire decision record →

Consultation & key dates

Alt. reference
PP-14200678
Planning Portal ref
PP-14200678
Neighbours
28 Nov 2025
Consultation
27 Nov 2025
Comments by
18 Dec 2025
Site or press notice
29 Aug 2025
Committee
9 Dec 2025
Statutory expiry
25 Nov 2025
Env. assessment
No
North East Derbyshire
Planning Authority Score
4.6/10
Below average
#168 of 296 councils
Relevant to this application:
Major dwellings

North East Derbyshire ranks #166 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North East Derbyshire decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #89 of 296
93%
Householder approved
Above avg (90%) #133 of 296
62%
Decided in 8 weeks
Below avg (63%) #166 of 296
44%
Extended time limit
Above avg (41%) #181 of 296
87%
Minor dwellings approved
45 decided (1-9 homes)
100%
Major dwellings approved
8 decided (10+ homes)
82%
Change of use approved
28 decided
532
Total decisions
42 refused in the year to March 2026