3 Beechnut Road KENDAL LA9 7FF Data via plota.co.uk
Pending
2026/1308/TPO
Description
South Lakeland DC TPO No 256 2014 - T17, 18 & 19 - Beech - reduce overlapping branches back by maximum of 3.5metres to reduce shading over garden area Data via plota.co.uk
Work with planning data? Every application in Westmorland and Furness - and every UK council - as a live feed or API. About Plota's data service
Nearby new applications
Historical activity at this location
20 nearby applications on record - archival context, not part of the live application.
Within ~100m
Nearby activity
2025
Approved
30 Beechnut Road KENDAL LA9 7FF
South Lakeland DC TPO No 256 2014 256 - T1 (Beech) reduce the side by the house by up to…
2025
Approved
30 Beechnut Road KENDAL LA9 7FF
South Lakeland DC TPO No 256 2014 256 - T1 (Beech) reduce the side by the house by up to…
2023
Approved
Land to the North West of 9 Wintergreen Close, KENDAL, LA9 7FN
Five Day Notice - T1 Mature Beech Tree - Fell unstable beech tree which is leaning heavil…
2023
Approved
Land to the North West of 9 Wintergreen Close, KENDAL, LA9 7FN
Five Day Notice - T1 Mature Beech Tree - Fell unstable beech tree which is leaning heavil…
2022
Approved
2 Beechnut Road, KENDAL, Cumbria, LA9 7FF
Demolition of existing detached garage, erection of a new two storey annexe extension inc…
2022
Approved
2 Beechnut Road, KENDAL, Cumbria, LA9 7FF
Demolition of existing detached garage, erection of a new two storey annexe extension inc…
2023
Approved
14 Beechnut Road, KENDAL, LA9 7FF
Single storey rear extension extending 4.60 metres (measured externally) beyond the rear…
2023
Approved
14 Beechnut Road, KENDAL, LA9 7FF
Single storey rear extension extending 4.60 metres (measured externally) beyond the rear…
2021
Approved
30 Beechnut Road, KENDAL, LA9 7FF
T1(Beech)-Lightly tip back from gable end of property, T2(Sycamore)-remove extending limb…
2021
Approved
30 Beechnut Road, KENDAL, LA9 7FF
T1(Beech)-Lightly tip back from gable end of property, T2(Sycamore)-remove extending limb…
2020
Approved
1 Beechnut Road, KENDAL, LA9 7FF
Beech - Reduce canopy by 2.5-3 metres, reduce low branch to SE by 2-2.5 metres
2020
Approved
1 Beechnut Road, KENDAL, LA9 7FF
Beech - Reduce canopy by 2.5-3 metres, reduce low branch to SE by 2-2.5 metres
2017
Approved
30 Beechnut Road, Kendal, LA9 7FF
Prune two Beech & one Sycamore by reducing branches by 3 metres from the property and 15%…
2017
Approved
1 Beechnut Road, KENDAL, LA9 7FF
Thin beech tree by 30% and Crown Lift by up to 4 metres
2017
Approved
30 Beechnut Road, Kendal, LA9 7FF
Prune two Beech & one Sycamore by reducing branches by 3 metres from the property and 15%…
2017
Approved
1 Beechnut Road, KENDAL, LA9 7FF
Thin beech tree by 30% and Crown Lift by up to 4 metres
2017
Approved
9 Wintergreen Close, KENDAL, LA9 7FN
Single storey rear extension, flat roof with lantern roof windows extending 4.5 metres (m…
2017
Approved
9 Wintergreen Close, KENDAL, LA9 7FN
Single storey rear extension, flat roof with lantern roof windows extending 4.5 metres (m…
2016
Approved
7 Redwood Drive, Natland, KENDAL, LA9 7FL
Two single storey side extensions
2016
Approved
7 Redwood Drive, Natland, KENDAL, LA9 7FL
Two single storey side extensions
Westmorland and Furness
Planning Authority Score
3.1/10
Poor
#233 of 296 councils
Relevant to this application:
Householder decisions
Westmorland and Furness is slower than most councils at deciding householder applications, ranking #235 out of 296. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).
Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application.
View full council performance
Westmorland and Furness decision performance
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #96 of 296
93%
Householder approved
Above avg (90%) #145 of 296
51%
Decided in 8 weeks
Below avg (63%) #235 of 296
52%
Extended time limit
Above avg (41%) #238 of 296
84%
Minor dwellings approved
69 decided (1-9 homes)
100%
Major dwellings approved
18 decided (10+ homes)
89%
Change of use approved
135 decided
1,204
Total decisions
91 refused in the year to March 2026