The Ship 7 St Cuthberts Street Bedford Bedfordshire MK40 3JB Data via plota.co.uk

25/02438/FUL - Full Planning Approved

Proposal

Removal of built in planters, refurbishment of the existing porch areas, decorations and additional decking, handrails, floor finishes, fencing, gate and associated timber posts. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Dec 2025
✓
Validated
16 Mar 2026
✓
Consultation
19 Mar 2026
✓
Approved
5 Jun 2026

Approved on 5 Jun 2026 · Officers (Delegated) · Last checked 11 Jul 2026

Site constraints 7

16 listed buildings within 150 m of the postcode pin
Nearest: 8-12, St Cuthbert's Street, Grade II, about 3 m from the postcode pin · 16 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 16 with distances
Historic England ↗
Bedford conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Bedford
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
Air quality management area: Bedford Town Centre AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Scheduled monument about 113 m away: Bedford Castle motte and bailey
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
National infrastructure project about 701 m away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application; Inside the Bedford built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bedford - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bedford
Application type
Full Planning
Postcode
MK40 3JB
Received
8 Dec 2025
Validated
16 Mar 2026
Ward
Castle & Newnham
Parish
Bedford Town
Case officer
Show
Target decision
5 Jun 2026
Decision
Grant Permission
Decision date
5 Jun 2026
Decision level
Officers (Delegated)
Applicant
Show
Agent
Blackdog - Mr D Walker
Freehold owner
Show

How this decision compares

Decided in 81 days from validation, 27 days slower than Bedford's median of 54 for extensions. Approved, as 84% of extensions here are.

64%decided within 8 weeks
84%approved
601decided in the last year

Plota live figures for extensions decided by Bedford in the last twelve months, from validation. Bedford decision record →

Consultation & key dates

Alt. reference
PP-14486956
Planning Portal ref
PP-14486956
Neighbours
19 Mar 2026
Consultation
19 Mar 2026
Comments by
20 Apr 2026
Site or press notice
23 Mar 2026
Env. assessment
No
Bedford
Planning Authority Score
2.4/10
Poor
#253 of 296 overall
Relevant to this application:
Householder decisions

Bedford is slower than most councils at deciding householder applications: #201 of 296 on speed. 52% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bedford decision statistics
Based on MHCLG data, the year to March 2026
80%
Overall approval rate
Below avg (87%) #259 of 296
86%
Householder approved
Below avg (90%) #239 of 296
56%
Decided in 8 weeks
Below avg (63%) #201 of 296
52%
Extended time limit
Above avg (41%) #233 of 296
52%
Minor dwellings approved
109 decided (1-9 homes)
69%
Major dwellings approved
26 decided (10+ homes)
67%
Change of use approved
57 decided
993
Total decisions
203 refused in the year to March 2026

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.