27A South Parade Southsea PO5 2JF Data via plota.co.uk

26/01087/FUL - Full Application Awaiting decision

Proposal

Retrospective application for Installation of 2no. condenser units within an acoustic enclosure Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
17 Sept 2026
✓
Validated
29 Sept 2026
✓
Consultation
30 Sept 2026
Decision
Expected by 24 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 24 Nov 2026 and 28 Dec 2026, from Portsmouth's recent utility and infrastructure works.

The consultation period closed on 30 Oct 2026.

Site constraints 7

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
The Sea Front, Southsea conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Special protection area 176 m away: Solent and Dorset Coast
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Registered park or garden 48 m away: Southsea Common
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Also on the record
4 listed buildings within 150 m; Inside the Portsmouth built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 2

Last sold for £105,000 in September 1999. Flat or maisonette, freehold.

27 September 1999£105,000
15 January 1996£175,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Full Application
Postcode
PO5 2JF
Received
17 Sept 2026
Validated
29 Sept 2026
Ward
St Jude
Case officer
Show
Target decision
24 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Malathy Group Limited

Decision outlook

Day 55 of the 56-day target. Portsmouth usually decides utility and infrastructure works by day 81.

Day 5526 days to the predicted decision (day 81)
41%decided within 8 weeks
96%approved
27decided in the last year

Plota live figures for utility and infrastructure works decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

4comments received
4 objecting

100% object · above the UK average of 74%

52 neighbours consulted · Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15224161
Planning Portal ref
PP-15224161
Neighbours
30 Sept 2026
Consultation
30 Sept 2026
Comments by
30 Oct 2026
Site or press notice
9 Oct 2026
Statutory expiry
24 Nov 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 overall
Relevant to this application:
Householder decisions

Portsmouth is #188 of 296 councils on householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.