St Ronans Care Home 23 - 31 St Ronans Road Southsea PO4 0PP Data via plota.co.uk

26/01293/FUL - Full Application Awaiting decision

Proposal

Construction of 3 storey rear infill extensions with dual pitched rooves; rear roof extension to incorporate lift shaft, installation of 5no. dormers to front roofslope; alterations to front fenestration and construction of single storey outbuilding to rear Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Nov 2026
✓
Validated
16 Nov 2026
Decision
Expected by 11 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 10 Jan 2027, from Portsmouth's recent extensions.

Site constraints 5

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Also on the record
Conservation area 67 m away: Craneswater and Eastern Parade, Southsea; National infrastructure project 2 km away: AQUIND Interconnector; Inside the Portsmouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 18 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Full Application
Postcode
PO4 0PP
Received
5 Nov 2026
Validated
16 Nov 2026
Ward
Eastney & Craneswater
Case officer
Show
Target decision
11 Jan 2027
Decision level
Delegated
Applicant
Show
Agent
JB Architects

Decision outlook

Day 7 of the 56-day target. Portsmouth usually decides extensions by day 55.

Day 749 days to the 56-day target
62%decided within 8 weeks
85%approved
284decided in the last year

Plota live figures for extensions decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

No public comments yet.

Last counted 18 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15297454
Planning Portal ref
PP-15297454
Statutory expiry
11 Jan 2027
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 overall
Relevant to this application:
Householder decisions

Portsmouth is #188 of 296 councils on householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026