Land Adjacent Blackthorn Road, Attleborough, Norfolk, NR17 1YL Data via plota.co.uk

PL/2025/1168/FMIN - FMIN minor application Pending Consideration

Proposal

Redevelopment of site to create EV charging hub; comprising the formation of hard standing, 10.no EV charging bays along with new landscaping scheme and ancillary electrical equipment Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Aug 2025
✓
Validated
18 Aug 2025
Decision
Target date was 28 Nov 2025

Under consideration

No decision has been issued yet. Plota predicted a decision around 23 Nov 2026; it is now day 462.

Documents 52

Plans & drawings 22

PDF M037 001L Landscape Layout Amended Plans/Documents · 16 Oct 2026 View ↗ PDF ZST 0000 13 03AJ Accessories Layout Amended Plans/Documents · 16 Oct 2026 View ↗ PDF ZST 0000 13 09J Site Elevation Amended Plans/Documents · 16 Oct 2026 View ↗ PDF M037 002L Planting Plan Amended Plans/Documents · 16 Oct 2026 View ↗ PDF ZST 0000 03J Proposed Site Layout Amended Plans/Documents · 16 Oct 2026 View ↗ PDF ZST 0000 13 01K Lightning Amended Plans/Documents · 16 Oct 2026 View ↗ PDF M037001C Landscape Layout Supporting/Supplementary Information/Documents · 11 Dec 2025 View ↗ PDF kmc24166 003 A Proposed Site Layout Highway Works Amended Plans/Documents · 11 Dec 2025 View ↗ PDF 11-01 Signage (Single Pole details) Dated 29/02/24 Other Plans · 12 Aug 2025 View ↗ PDF 13-01/A Lighting Drawing Dated 26/11/24 Other Plans · 12 Aug 2025 View ↗ PDF 21-01/C Generic GRP Substation (Elevations & Plan View) Dated 07/11/24 Other Plans · 12 Aug 2025 View ↗ PDF Detail Drawing (4m Totem) Other Plans · 12 Aug 2025 View ↗ PDF 02/F Existing Layout (inc. Location Plan) Location/Site/Block Plans · 12 Aug 2025 View ↗ PDF 03/D Ductwork Layout Other Plans · 12 Aug 2025 View ↗ PDF 09/D Site Elevations Other Plans · 12 Aug 2025 View ↗ PDF 03-A/D Accessories Layout Dated 05/08/25 Other Plans · 12 Aug 2025 View ↗ PDF 03/D Proposed Layout (inc. location plan) Dated 05/08/25 Other Plans · 12 Aug 2025 View ↗ PDF 01/A Location Plan Dated 30/07/24 Location/Site/Block Plans · 12 Aug 2025 View ↗ PDF 06/E -BYD 160 Charging Point- Hardware Details (Elevations) Dated 18/10/24 Other Plans · 12 Aug 2025 View ↗ PDF 07-08/C HYC 300 kW Charging Point Hardware Details Dated 20/08/24 Other Plans · 12 Aug 2025 View ↗ PDF 0100-02/F Swept Path Analysis Dated 30/05/25 Other Plans · 12 Aug 2025 View ↗ PDF 001 Landscaping Layout Dated 26.05.25 Other Plans · 12 Aug 2025 View ↗

Application forms 2

PDF Commenter’s name hidden Show Application Forms/Certificates (public/redacted) · 12 Aug 2025 View ↗
PDF Commenter’s name hidden Show Application Forms/Certificates (public/redacted) · 12 Aug 2025 View ↗

All documents on the council site ↗

Site constraints 1

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for an EV charging hub?

Plota Sites searches every land parcel in England and Wales: 258 sites fit this search. On and off the market, free to search.

Land for EV charging hubs
Work with planning data?

Every application in Breckland - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Breckland
Application type
FMIN minor application
Postcode
NR17 1YL
Received
6 Aug 2025
Validated
18 Aug 2025
Ward
Attleborough Queens and Besthorpe
Parish
Attleborough
Case officer
Show
Target decision
28 Nov 2025
Decision level
Delegated decision
Applicant
Show
Freehold owner
Show

Decision outlook

Day 462, past the statutory target. 52% of full applications in Breckland are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 22 Nov 2026.

Day 462406 days past the 56-day target
34%decided within 8 weeks
81%approved
10%go to committee

Plota live figures for full applications decided by Breckland in the last twelve months, from validation. Breckland decision record →

Consultation & key dates

Statutory expiry
28 Nov 2025
Breckland
Planning Authority Score
8.6/10
Excellent
#14 of 296 overall
Relevant to this application:
Householder decisions

Breckland is faster than most councils at deciding householder applications: #32 of 296 on speed. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Breckland decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #216 of 296
98%
Householder approved
Above avg (90%) #12 of 296
81%
Decided in 8 weeks
Above avg (63%) #32 of 296
34%
Extended time limit
Below avg (41%) #84 of 296
54%
Minor dwellings approved
178 decided (1-9 homes)
88%
Major dwellings approved
17 decided (10+ homes)
801
Total decisions
128 refused in the year to March 2026

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.