28 Reforne Portland DT5 2AL Data via plota.co.uk

P/TRC/2026/06363 - Tree Works- Conservation Area Out To Consultation

Proposal

T1 Conifer - Fell Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Nov 2026
Decision
Expected by 7 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 8 Dec 2026, from Dorset's recent tree and landscaping works.

Comments are open until 3 Dec 2026

Comment on this application ↗

Site constraints 6

Portland Conservation Area 1 conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
14 listed buildings within 150 m
Nearest: 30, Reforne, Grade II, 3 m away · 1 Grade II*, 13 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 14 with distances
Historic England ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
SSSI 154 m away: Isle of Portland SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Inside the Weston (Dorset) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 12 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Tree Works- Conservation Area
Postcode
DT5 2AL
Received
12 Nov 2026
Validated
12 Nov 2026
Ward
Portland Ward
Parish
Portland
Case officer
Show
Decision level
Delegated
Applicant
Show

Decision outlook

Day 11 of the 56-day target. Dorset usually decides tree and landscaping works by day 26.

Day 1145 days to the 56-day target
99%decided within 8 weeks
95%approved
2,324decided in the last year

Plota live figures for tree and landscaping works decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
3 Dec 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 overall
Relevant to this application:
Other decisions

Dorset is faster than most councils at deciding householder applications: #51 of 296 on speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026