Anstey Hall Maris Lane Cambridge Cambridgeshire CB2 9LG Data via plota.co.uk

26/1316/TTCA - Works to CA trees Awaiting decision

Proposal

T01 - COPPER BEECH - Fell - due to extensive decay. T07 - HORSE CHESTNUT- Fell - due to extensive decay. T14 - COPPER BEECH- Fell - due to extensive decay. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Nov 2026
Decision
Expected by 21 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 15 Dec 2026, from Cambridge's recent tree and landscaping works.

Site constraints 8

Grade II* listed: Anstey Hall
List entry 1331876 · The pin is inside its outline · 9 more listed buildings within 150 m (1 Grade I, 1 Grade II*, 6 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 9 with distances
Historic England ↗
Trumpington conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Cambridge Core Area; Local nature reserve 460 m away: Byron's Pool; Inside the Cambridge (Cambridge) built-up area; National infrastructure project 1.1 km away: East West Rail - Bedford to Cambridge and Western improvements, at pre-application; Priority habitat 26 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 12 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area149 m² (1,604 sq ft)
Energy ratingC (asset rating 52)
UseD1 Non-residential Institutions - Primary Health Care Building
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in February 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Cambridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cambridge
Application type
Works to CA trees
Postcode
CB2 9LG
Received
9 Nov 2026
Validated
9 Nov 2026
Ward
Trumpington
Target decision
21 Dec 2026
Applicant
Show

Decision outlook

Day 14 of the 56-day target. Cambridge usually decides tree and landscaping works by day 36.

Day 1442 days to the 56-day target
94%decided within 8 weeks
96%approved
662decided in the last year

Plota live figures for tree and landscaping works decided by Cambridge in the last twelve months, from validation. Cambridge decision record →

Public comments

No public comments yet.

3 neighbours consulted · Last counted 20 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
21 Dec 2026
Env. assessment
No
Cambridge
Planning Authority Score
8.3/10
Excellent
#18 of 296 overall
Relevant to this application:
Householder decisions

Cambridge is one of the fastest councils in England for householder decisions: #21 of 296 on speed. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cambridge decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #108 of 296
94%
Householder approved
Above avg (90%) #100 of 296
86%
Decided in 8 weeks
Above avg (63%) #21 of 296
26%
Extended time limit
Below avg (41%) #34 of 296
74%
Minor dwellings approved
86 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
80%
Change of use approved
41 decided
1,014
Total decisions
100 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.