Various Locations Along Mitchell Avenue Ventnor Isle Of Wight Data via plota.co.uk

25/01297/TW - Tree Works in Conservation Area Approved

Proposal

T1 - T27; Lime - Repollard. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Sept 2025
✓
Approved
20 Oct 2025

Approved on 20 Oct 2025 · Planning Officer Delegated Decision · Last checked 12 Oct 2026

Site constraints 7

Special area of conservation about 24 m away: Isle of Wight Downs
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI about 24 m away: Ventnor Downs SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National landscape about 18 m away: Isle Of Wight
Outside the landscape; its setting can still be raised.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Also on the record
Inside the Ventnor built-up area; Priority habitat about 24 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 5, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Isle of Wight - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Tree Works in Conservation Area
Received
5 Sept 2025
Validated
5 Sept 2025
Ward
Ventnor And St Lawrence
Parish
Ventnor
Case officer
Show
Decision
No Objection
Decision date
20 Oct 2025
Decision level
Planning Officer Delegated Decision
Applicant
Show
Agent
Island Roads

How this decision compares

Decided in 45 days from validation, about the council's usual 48 days. Approved, as 94% of tree and landscaping works here are.

68%decided within 8 weeks
94%approved
524decided in the last year

Plota live figures for tree and landscaping works decided by Isle of Wight in the last twelve months, from validation. Isle of Wight decision record →

Public comments

No public comments yet.

Last counted 12 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
17 Oct 2025
Env. assessment
No
Isle of Wight
Planning Authority Score
8.9/10
Excellent
#7 of 296 overall
Relevant to this application:
Other decisions

Isle of Wight is one of the fastest councils in England for householder decisions: #11 of 296 on speed. Only 15% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Isle of Wight decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #84 of 296
95%
Householder approved
Above avg (90%) #81 of 296
92%
Decided in 8 weeks
Above avg (63%) #11 of 296
15%
Extended time limit
Below avg (41%) #11 of 296
84%
Minor dwellings approved
144 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
94%
Change of use approved
34 decided
792
Total decisions
63 refused in the year to March 2026