Tides Leisure Centre Park Avenue Deal Kent CT14 9UU Data via plota.co.uk

CON/25/00666/C - Conditions Approved

Proposal

Discharge of condition 17a (contaminated land and verification) pursuant to application Erection of replacement two-storey leisure building (including indoor swimming pool, fitness suite, studios, changing facilities and cafe) with link to existing sports hall and tennis centre complex, with associated landscaping works, following demolition of the existing pool building Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Mar 2026
✓
Approved
20 Mar 2026

Approved on 20 Mar 2026 · Delegated · Last checked 6 Jul 2026

Associated applications 7

Site constraints 5

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Also on the record
Radon affected area, class 3; Coalfield, development low risk area; 1 listed building within 150 m; Inside the Deal built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area5,944 m² (63,981 sq ft)
Energy ratingC (asset rating 60)
UseD2 General Assembly and Leisure plus Night Clubs and Theatres
HeatingHeating and Mechanical Ventilation

From the energy performance certificate lodged in January 2022, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Dover - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dover
Application type
Conditions
Postcode
CT14 9UU
Received
20 Mar 2026
Validated
20 Mar 2026
Ward
Middle Deal
Parish
DEAL
Case officer
Show
Target decision
15 May 2026
Decision
Condition Approved
Decision date
20 Mar 2026
Decision level
Delegated

Consultation & key dates

Statutory expiry
15 May 2026
Env. assessment
No
Dover
Planning Authority Score
7.4/10
Good
#46 of 296 councils
Relevant to this application:
Householder decisions

Dover is one of the fastest councils in England for householder decisions, ranking #28 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dover decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #151 of 296
92%
Householder approved
Above avg (90%) #151 of 296
83%
Decided in 8 weeks
Above avg (63%) #28 of 296
31%
Extended time limit
Below avg (41%) #57 of 296
72%
Minor dwellings approved
105 decided (1-9 homes)
83%
Major dwellings approved
18 decided (10+ homes)
82%
Change of use approved
56 decided
772
Total decisions
89 refused in the year to March 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.