Remaining Area Of Acton Gardens Master Plan (South Acton Estate) Acton W3 8TQ Data via plota.co.uk

Approved 254062CND
Council
Date received
24 Oct 2025
Date validated
24 Oct 2025
Postcode
W3 8TQ

Description

Submission of the Landscape Management Plan part pursuant to condition 68 (Phases 9.3 & 9.5 & 9.6) of outline planning permission dated 24/12/2018 for the 'Hybrid planning application for the continued regeneration of the South Acton Estate encompassing an outline mixed use development comprising; up to 195,396sqm residential floorspace (Class C3) with any associated temporary show homes; up to 2,200sqm non-residential floorspace including 1,200sqm of community space (Class D1) and up to 1,000sqm of flexible commercial space (Class A1, A2, A3, B1, D1, D2); an energy centre up to 750sqm, access, open space and public realm. Detailed permission is sought for access, appearance, landscaping, layout and scale of Phase 9.2 comprising 20,612sqm (of the total 195,396sqm) of residential floorspace (Class C3) [203 dwellings] and 123sqm (of the total 1,000sqm) flexible commercial floorspace (Class A1, A2, A3, B1, D1, D2) with associated refuse/recycling and bicycle storage; plant rooms; car parking; works to the public highway, public realm improvements, following the demolition of Buchan House, Anstey Court, properties on Osborne Road and tree removal' Data via plota.co.uk

Last checked

Associated applications 14

Site constraints 6

Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 951 m away: Thames Tideway Tunnel
The site is 951 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square; Designated open space 26 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 10 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 councils
Relevant to this application:
Major dwellings

Ealing is slower than most councils at deciding householder applications, ranking #264 out of 296. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026