Acton Gardens Phase 8.1 And 8.2 Acton Bollo Lane W3 8TQ Data via plota.co.uk

261115CND - Discharge Condition Pending Consideration

Proposal

Details of Materials and Site Furnishings (including samples), part pursuant to Condition 9 in relation to Phase 8.1 and 8.2 only of planning permission ref: dated 23/06/2020 for: Reserved matters application for Phases 8.1 and 8.2 of the Remaining Acton Gardens Masterplan pursuant to conditions 7 (Reserved Matters) and 8 (Reserved Matters Details) of the Hybrid Outline Planning Permission Ref: (dated 24/12/2018) for the continued regeneration of the South Acton Estate. Application seeks approval for Means of Access, Appearance, Landscaping, Layout and Scale in relation to the construction of buildings varying in height from 7.7m AGL - 32m AGL (2-10 storeys) comprising 336 new residential units; with associated private and semi-private amenity space; refuse/recycling and bicycle storage; plant rooms; car parking; tree removal and public realm improvements; and the demolition of Barwick House, Carisbrooke Court, Ludlow Court, maisonettes along Brouncker Road, and the South Acton Working Men's Club. Application is accompanied by an Environmental Statement of Compliance Data via plota.co.uk

View original council record ↗Last checked

Ealing Council is publishing its applications late: so far it has put about three fifths of those it has numbered since early September on its register. Plota adds each one as soon as the council publishes it.

Application progress

✓
Received
10 Mar 2026
✓
Consultation
13 Mar 2026
Decision
Target date was 5 May 2026

Under consideration

No decision has been issued yet. The council's target date, 5 May 2026, has passed.

The consultation period closed on 3 Apr 2026.

Documents 25

All documents on the council site ↗

Associated applications 14

Site constraints 4

Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project 586 m away: Thames Tideway Tunnel
The site is 586 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Ealing built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Ealing - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Ealing
Application type
Discharge Condition
Postcode
W3 8TQ
Received
10 Mar 2026
Validated
10 Mar 2026
Ward
South Acton
Case officer
Show
Target decision
5 May 2026
Applicant
Show
Agent
Bowman Riley Architects

Public comments

No public comments yet.

Last counted 19 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14767985
Planning Portal ref
PP-14767985
Consultation
13 Mar 2026
Comments by
3 Apr 2026
Statutory expiry
5 May 2026
Env. assessment
No
Ealing
Planning Authority Score
1.5/10
Poor
#281 of 296 overall
Relevant to this application:
Householder decisions

Ealing is slower than most councils at deciding householder applications: #264 of 296 on speed. The council extends the time limit on 61% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Ealing decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #220 of 296
88%
Householder approved
Below avg (90%) #218 of 296
41%
Decided in 8 weeks
Below avg (63%) #264 of 296
61%
Extended time limit
Above avg (41%) #272 of 296
74%
Minor dwellings approved
302 decided (1-9 homes)
94%
Major dwellings approved
17 decided (10+ homes)
54%
Change of use approved
52 decided
1,973
Total decisions
306 refused in the year to March 2026