Ferrybridge Mfe Limited Kirkhaw Lane Knottingley WF11 8RD Data via plota.co.uk

26/01448/ADV - Application to Display Adverts Approved

Proposal

Gantry/Totem Signage Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Aug 2026
✓
Approved
6 Oct 2026

Approved on 6 Oct 2026 · Delegated Decision · Last checked 7 Oct 2026

Site constraints 5

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
National infrastructure project 122 m away: Ferrybridge Multifuel 2 (FM2) Power Station
The site is 122 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Ferrybridge Carbon Capture and Storage (at pre-application, the site is inside its boundary); Ferrybridge Next Generation Power Station (at pre-application, 185 m); East Coast Hydrogen Humber Pipeline (at pre-application, 1109 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Coalfield, development low risk area; Inside the Holmfield built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wakefield - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wakefield
Application type
Application to Display Adverts
Postcode
WF11 8RD
Received
12 Aug 2026
Validated
12 Aug 2026
Ward
Knottingley
Parish
Knottingley
Case officer
Show
Target decision
7 Oct 2026
Decision
Application Approved
Decision date
6 Oct 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Oxalis Planning Ltd

How this decision compares

Decided in 55 days from validation, about the council's usual 56 days. Approved, as 79% of signs and adverts here are.

57%decided within 8 weeks
79%approved
42decided in the last year

Plota live figures for signs and adverts decided by Wakefield in the last twelve months, from validation. Wakefield decision record →

Public comments

No public comments yet.

Last counted 7 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15153121
Planning Portal ref
PP-15153121
Statutory expiry
7 Oct 2026
Env. assessment
No
Wakefield
Planning Authority Score
3.6/10
Below average
#217 of 296 councils
Relevant to this application:
Other decisions

Wakefield is slower than most councils at deciding householder applications, ranking #223 out of 296. The council extends the time limit on 56% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wakefield decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #95 of 296
95%
Householder approved
Above avg (90%) #94 of 296
53%
Decided in 8 weeks
Below avg (63%) #223 of 296
56%
Extended time limit
Above avg (41%) #256 of 296
89%
Minor dwellings approved
79 decided (1-9 homes)
92%
Major dwellings approved
24 decided (10+ homes)
85%
Change of use approved
74 decided
1,084
Total decisions
88 refused in the year to March 2026