Waverley New Community off High Field Spring Catcliffe 9999 Data via plota.co.uk

RB2025/0021 Approved

Proposal

Non-material application to vary condition 17 (off-site highways junction at Treeton Lane) imposed by for Harworth Estates (Waverley Prince) Limited Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Dec 2024
✓
Validated
9 Jan 2025
✓
Approved
27 Feb 2025

Approved on 27 Feb 2025 · Delegated (Part 2A) · Last checked 19 Oct 2026

Associated applications 15

Site constraints 5

Surface water flood risk
Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment.
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Surface water flood riskCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 2; National infrastructure project about 2 km away: Whitestone Solar Farm; Inside the Waverley and Catcliffe built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Rotherham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Rotherham
Received
27 Dec 2024
Validated
9 Jan 2025
Case officer
Show
Decision
GRANTED
Decision date
27 Feb 2025
Decision level
Delegated (Part 2A)
Applicant
Show
Agent
Stantec

How this decision compares

Decided in 49 days from validation, 52 days faster than Rotherham's median of 101 for full applications. Approved, as 100% of full applications here are.

24%decided within 8 weeks
100%approved
21decided in the last year

Plota live figures for full applications decided by Rotherham in the last twelve months, from validation. Rotherham decision record →

Consultation & key dates

Consultation
10 Jan 2025
Comments by
31 Jan 2025
Statutory expiry
5 Mar 2025
Rotherham
Planning Authority Score
4.7/10
Below average
#167 of 296 overall
Relevant to this application:
Householder decisions

Rotherham is #107 of 296 councils on householder decision speed. Rotherham is also one of the strictest councils - it refuses more householder applications than almost any other, with only 71% approved vs 90% nationally.

One of the strictest councils
only 71% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Rotherham decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #266 of 296
71%
Householder approved
Below avg (90%) #295 of 296
72%
Decided in 8 weeks
Above avg (63%) #107 of 296
32%
Extended time limit
Below avg (41%) #68 of 296
78%
Minor dwellings approved
63 decided (1-9 homes)
100%
Major dwellings approved
20 decided (10+ homes)
83%
Change of use approved
58 decided
750
Total decisions
156 refused in the year to March 2026