Flats 78 To 81 78 - 81 The Keep Kingston Upon Thames KT2 5UB Data via plota.co.uk

Pending 25/01315/TPO
Date received
14 May 2025
Date validated
15 May 2025
Postcode
KT2 5UB

Description

T34 - Cherry - Crown lift up to 3m from ground level and remove deadwood, T33 - Cherry - Crown lift up to 3m from ground level, cutback from any property ensuring 2m clearance and remove deadwood, T31 - Maple - Crown lift up to 3m from ground level and reduce overextended laterals of the lower crown by up to 1.5m, T30 - Maple - Crown clean (removal of deadwood, dying branches and crossing branches), T22 - Maple - Remove the 2 lowest limbs overhanging the carparking spaces, T21 - Maple and T20 - Sycamore - Crown lift up to 4m from ground level, T26 - Maple - Crown lift up to 4m from ground level and cutback from the building and lamp post providing 2m clearance, T112 - Maples - Crown lift up to 4m from ground level and cutback from the building providing 2m clearance, T94 - Maples - Remove the lowest cluster of epicormic growth back to the source and cutback from the building providing 2m clearance, T102, T106, T23 - Maple - Crown lift up to 4m from ground level and cutback from the building providing 2m clearance. T4 and T5 - Maple - Crown lift up to 3m from ground level. Data via plota.co.uk

Last checked

Decision outlook

Plota predicted a decision around 19 Nov 2026; it is now day 553.

Day 553, past the statutory target. 99% of tree and landscaping works in Kingston upon Thames are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 9 Nov 2026.

Day 553497 days past the 56-day target
82%decided within 8 weeks
98%approved
405decided in the last year

Plota live figures for tree and landscaping works decided by Kingston upon Thames in the last twelve months, from validation. Kingston upon Thames decision record →

Site constraints 5

Air quality management area: Kingston upon Thames AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Tree preservation order about 14 m away; Inside the Kingston upon Thames built-up area; Public transport access: PTAL 1a (very poor), TfL 2023, for the 100 m square; National infrastructure project about 1245 m away: Teddington Direct River Abstraction (TDRA), at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 9 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kingston upon Thames - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Kingston upon Thames
Planning Authority Score
6.5/10
Good
#76 of 296 councils
Relevant to this application:
Householder decisions

Kingston upon Thames is faster than most councils at deciding householder applications, ranking #33 out of 296. Only 20% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Kingston upon Thames is also one of the strictest councils - it refuses more householder applications than almost any other, with only 82% approved vs 90% nationally.

One of the strictest councils
only 82% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Kingston upon Thames decision statistics
Based on MHCLG data, the year to March 2026
75%
Overall approval rate
Below avg (87%) #288 of 296
82%
Householder approved
Below avg (90%) #266 of 296
81%
Decided in 8 weeks
Above avg (63%) #33 of 296
20%
Extended time limit
Below avg (41%) #18 of 296
44%
Minor dwellings approved
124 decided (1-9 homes)
60%
Major dwellings approved
10 decided (10+ homes)
42%
Change of use approved
26 decided
1,112
Total decisions
274 refused in the year to March 2026