23 Flat Basement, Tadmor Street, London, Hammersmith And Fulham, W12 8AH Data via plota.co.uk

P/2026/02976/TREE - Works to Tree(s) in Conservation Area REGISTERED: Under Assessment

Proposal

Sycamore Tree - rear garden - suffering from significant decay, particularly on the left-hand side of the trunk, with a large visible cavity and extensive internal rot. Concerns about it's structural integrity and the potential danger it poses to people and surrounding properties. Requesting permission to remove the tree on safety grounds. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
18 Nov 2026
✓
Validated
19 Nov 2026
Decision
Expected by 14 Jan 2027

Under consideration

No decision has been issued yet. Plota predicts a decision around 14 Jan 2027, from Hammersmith and Fulham's recent tree and landscaping works.

Site constraints 9

Shepherds Bush conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Hammersmith and Fulham AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Shepherds Bush Town Centre
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1.4 km away: Thames Tideway Tunnel; 2 listed buildings within 150 m; Inside the Hammersmith and Fulham built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 25 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area80 m² (861 sq ft)
Energy ratingC (74 out of 100)
PropertyMid-terrace flat, 3 habitable rooms
BuiltBefore 1900
HeatingBoiler and radiators, mains gas
WallsSolid brick, as built, no insulation (assumed)

From the energy performance certificate lodged in February 2021, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Hammersmith and Fulham - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Tree(s) in Conservation Area
Postcode
W12 8AH
Received
18 Nov 2026
Validated
19 Nov 2026
Ward
Shepherd's Bush Green
Case officer
Show
Applicant
Show

Decision outlook

Day 8 of the 56-day target. Hammersmith and Fulham usually decides tree and landscaping works by day 56.

Day 848 days to the 56-day target
75%decided within 8 weeks
96%approved
75decided in the last year

Plota live figures for tree and landscaping works decided by Hammersmith and Fulham in the last twelve months, from validation. Hammersmith and Fulham decision record →

Consultation & key dates

Consultation
19 Nov 2026
Statutory expiry
31 Dec 2026
Hammersmith and Fulham
Planning Authority Score
3.7/10
Below average
#210 of 296 overall
Relevant to this application:
Other decisions

Hammersmith and Fulham is one of the slowest councils in England for householder decisions: #281 of 296 on speed. The council extends the time limit on 63% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 99% approval rate vs 90% nationally.

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Hammersmith and Fulham decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #20 of 296
99%
Householder approved
Above avg (90%) #4 of 296
33%
Decided in 8 weeks
Below avg (63%) #281 of 296
63%
Extended time limit
Above avg (41%) #275 of 296
97%
Minor dwellings approved
209 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
92%
Change of use approved
37 decided
1,321
Total decisions
60 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.