42 - 43 Charterhouse Square London EC1M 6EW Data via plota.co.uk
Proposal
Submission of (a) accommodate the location of the existing London Underground structures and tunnels and assess any structural impact due to the proposed works; (b) provide detailed design and Risk Assessment Method Statement for all demolition, temporary and permanent works; (c) provide detailed design and Risk Assessment Method Statement on the use of tall plant/scaffolding/lifting equipment; (d) demonstrate that there will at no time be any potential security risk to our railway, property or structures; (e) mitigate the effects of noise arising from the proposed works on LU assets; and (f) no works to commence on any part of TfL/LU Property or in it's airspace until any agreements required with TfL Engineering, TfL Property or TfL Legal have been agreed and signed by all parties pursuant to condition 5 of planning permission dated 02/07/2024. Data via plota.co.uk
Application progress
This application is under consideration - no decision has been issued yet. Plota predicted a decision around 13 Sept 2026; it is now day 251. The consultation period closed on 3 Feb 2026.
Documents 14
Statements & assessments 1
Application forms 3
Consultation & comments 3
Other documents 7
Associated applications 2
Part of
Conditions 5 awaiting decision
- ConditionsSubmission of (a) accommodate the location of the existing London Underground structures…This application26/00008/MDC
Site constraints 5
Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
88 St John Street, London, EC1M 4EH
Enlarging opening between rear restaurant area and kitchen, reorganising the com...
20 Giltspur Street London EC1A 9DD
Submission of Security Management Plan pursuant to Condition 34 of planning perm...
Central Criminal Court Old Bailey London EC4M 7EH
Refurbishment of existing WCs on the fourth floor, and introduction of additiona...
20 Giltspur Street London EC1A 9AW
Submission of the Delivery and Servicing Management Plan pursuant to Schedule 3 ...
North Wing St Bartholomews Hospital West Smithfield London EC1A 7BE
Submission of details of masonry and joinery repairs pursuant to condition 3 of ...
40 Holborn Viaduct London EC1N 2PB
Submission of Technical Note pursuant to partial discharge of condiiton 42(i) of...
Important details
- Council
- City of London
- Application type
- Submission of details (Planning)
- Postcode
- EC1M 6EW
- Received
- 5 Jan 2026
- Validated
- 5 Jan 2026
- Ward
- Farringdon Within
- Case officer
- Show
- Target decision
- 2 Mar 2026
- Decision level
- Delegated
- Applicant
- Show
- Agent
- Etchingham Architecture Ltd
Decision outlook
Day 251, past the statutory target. 75% of utility and infrastructure works in City of London are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 5 Sept 2026.
Plota live figures for utility and infrastructure works decided by City of London in the last twelve months, from validation. City of London decision record →
Public comments
No public comments yet.
Last counted 5 Sept 2026
Consultation & key dates
- Alt. reference
- PP-14600345
- Consultation
- 13 Jan 2026
- Comments by
- 3 Feb 2026
- Statutory expiry
- 2 Mar 2026
- Env. assessment
- No
Historical activity at this location
26 previous applications on record - archival context, not part of the live application.
Previous applications at this address
Nearby activity
City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.
Track this application
42 - 43 Charterhouse Square London EC1M 6EW
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
42 - 43 Charterhouse Square London EC1M 6EW
Works to Flat-6, over no. 42, including: (i) removal of existing and installation of new rooflights, (ii) new openings on pitched roof form at the south elevation, (iii) installation of PV panels on roof, (iv) Installation of new air source heat pump and batteries, (v) removal and replacement of existing aluminium windows at north and south elevations of Flat 6, with new timber double glazed windows to match those on the lower floors., (vi) new cladding to the walls of the existing lift motor room.
- Received
- 14 Feb 2024
- Decided
- 2 Jul 2024
- Outcome
- Approved
