4e Airport City Storage World Sunbank Lane Manchester M90 5AD Data via plota.co.uk

PLA-2026-002155 - Full planning permission Under Consultation

Proposal

Electric Vehicle Charging Hub with 14no. Charging Bays, 7no. ultrafast DC chargers, Canopy roof and equipment compound. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Oct 2026
Decision
Expected by 25 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Dec 2026, from Manchester's recent utility and infrastructure works.

Comments are open until 30 Nov 2026

Comment on this application ↗

Site constraints 5

Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Lost Wetlands; SSSI about 423 m away: Cotteril Clough SSSI; Inside the Hale (Trafford) built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 10 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Looking for land for an EV charging hub?

Plota Sites searches every land parcel in England and Wales: 258 sites fit this search. On and off the market, free to search.

Land for EV charging hubs
Work with planning data?

Every application in Manchester - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Manchester
Application type
Full planning permission
Postcode
M90 5AD
Received
30 Oct 2026
Validated
30 Oct 2026
Ward
Woodhouse Park
Case officer
Show
Target decision
25 Dec 2026
Applicant
Show
Agent
Iain Bailey

Decision outlook

Day 24 of the 56-day target. Manchester usually decides utility and infrastructure works by day 54.

Day 2432 days to the 56-day target
83%decided within 8 weeks
97%approved
95decided in the last year

Plota live figures for utility and infrastructure works decided by Manchester in the last twelve months, from validation. Manchester decision record →

Public comments

No public comments yet.

Last counted 17 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
30 Nov 2026
Manchester
Planning Authority Score
6.8/10
Good
#68 of 296 overall
Relevant to this application:
Householder decisions

Manchester is #146 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Manchester decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #174 of 296
95%
Householder approved
Above avg (90%) #84 of 296
65%
Decided in 8 weeks
Above avg (63%) #146 of 296
31%
Extended time limit
Below avg (41%) #59 of 296
76%
Minor dwellings approved
82 decided (1-9 homes)
94%
Major dwellings approved
54 decided (10+ homes)
65%
Change of use approved
49 decided
1,924
Total decisions
242 refused in the year to March 2026