Land adjacent Swinster House, Swinster Lane, East Halton, DN40 3NR Data via plota.co.uk

PA/2025/587 - Non-Material Amendment Refused

Proposal

Application for a non-material amendment to to change the roof construction from hipped to gable with dormer to rear and minor door and window alterations Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 6 May 2025
✗
Refused
16 May 2025
Appeal
Not lodged

Refused on 16 May 2025 · Last checked 14 Oct 2026

Associated applications 2

  • Part of

    Fullcouncil archive
    • AmendmentApplication for a non-material amendment to change the roof construction from hipped to gable…RefusedThis applicationPA/2025/587

Site constraints 4

Public footpath 15 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
National infrastructure project 252 m away: Hornsea Offshore Wind Farm (Zone 4) - Project Two
The site is 252 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, 252 m); North Killingholme Power Project (decided, 1433 m); Able Marine Energy Park (decided, 1469 m); Able Marine Energy Park Material Change 2 (decided, 1469 m); H2East Pipeline: Humber to Nottinghamshire (at pre-application, 61 m); Humber Carbon Capture Pipeline (at pre-application, 772 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the East Halton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non-Material Amendment
Postcode
DN40 3NR
Received
around 6 May 2025
Validated
6 May 2025
Ward
Ferry
Parish
East Halton
Case officer
Show
Decision
Refuse
Decision date
16 May 2025

How this decision compares

Decided in 10 days from validation, 14 days faster than North Lincs's median of 24 for amendments. Refused, as 8% of amendments here are.

96%decided within 8 weeks
92%approved
112decided in the last year

Plota live figures for amendments decided by North Lincs in the last twelve months, from validation. North Lincs decision record →

Consultation & key dates

Comments by
27 May 2025
North Lincs
Planning Authority Score
4.6/10
Below average
#169 of 296 councils
Relevant to this application:
Householder decisions

North Lincs ranks #123 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Lincs decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #195 of 296
91%
Householder approved
Above avg (90%) #177 of 296
70%
Decided in 8 weeks
Above avg (63%) #123 of 296
44%
Extended time limit
Above avg (41%) #182 of 296
70%
Minor dwellings approved
114 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
78%
Change of use approved
37 decided
705
Total decisions
96 refused in the year to March 2026