Land East of Townside, East Halton, DN40 3NL Data via plota.co.uk

PA/2026/1105 - Full planning permission Pending

Proposal

Planning permission to erect a one and a half storey dwelling Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 29 Sept 2026
Decision
Expected by 24 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 23 Nov 2026, from North Lincs's recent full applications.

The consultation period closed on 21 Oct 2026.

Site constraints 3

National infrastructure project 556 m away: Hornsea Offshore Wind Farm (Zone 4) - Project Two
The site is 556 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: Hornsea Offshore Wind Farm (Zone 4) - Project One (decided, 556 m); North Killingholme Power Project (decided, 1.4 km); Able Marine Energy Park (decided, 1.5 km); Able Marine Energy Park Material Change 2 (decided, 1.5 km); H2East Pipeline: Humber to Nottinghamshire (at pre-application, 480 m); Humber Carbon Capture Pipeline (at pre-application, 607 m); Humber Hydrogen Pipeline (at pre-application, 1.6 km).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the East Halton built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Lincs - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
DN40 3NL
Received
around 29 Sept 2026
Validated
29 Sept 2026
Ward
Ferry
Parish
East Halton
Case officer
Show

Decision outlook

Day 55, past North Lincs's usual 53 days for full applications. 93% are decided within thirteen weeks, so most likely by 29 Dec 2026.

Day 551 days to the 56-day target
67%decided within 8 weeks
88%approved
244decided in the last year

Plota live figures for full applications decided by North Lincs in the last twelve months, from validation. North Lincs decision record →

Consultation & key dates

Comments by
21 Oct 2026
North Lincs
Planning Authority Score
4.6/10
Below average
#169 of 296 overall
Relevant to this application:
Householder decisions

North Lincs is #123 of 296 councils on householder decision speed. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
North Lincs decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #195 of 296
91%
Householder approved
Above avg (90%) #177 of 296
70%
Decided in 8 weeks
Above avg (63%) #123 of 296
44%
Extended time limit
Above avg (41%) #182 of 296
70%
Minor dwellings approved
114 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
78%
Change of use approved
37 decided
705
Total decisions
96 refused in the year to March 2026