Noddle Hill Way Nature Reserve Bransholme Road Kingston Upon Hull HU7 4YP Data via plota.co.uk

26/01051/FULL - Full Planning Permission Pending Consideration

Proposal

Creation of a pond by modifying and expanding a wetland scrape area as habitat for Great Crested Newts under Natural England's District Level Licensing programme. (Pond 5) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 Oct 2026
Decision
Expected by 23 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Dec 2026, from Hull's recent tree and landscaping works.

Comments are open until 3 Dec 2026

Comment on this application ↗

Site constraints 4

Local nature reserve: Noddle Hill
Internationally or nationally protected for its wildlife. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Also on the record
National infrastructure project 684 m away: East Coast Hydrogen Humber Pipeline, at pre-application.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hull - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hull
Application type
Full Planning Permission
Postcode
HU7 4YP
Received
28 Oct 2026
Validated
28 Oct 2026
Ward
North Carr
Case officer
Show

Decision outlook

Day 26 of the 56-day target. Hull usually decides tree and landscaping works by day 42.

Day 2630 days to the 56-day target
78%decided within 8 weeks
93%approved
148decided in the last year

Plota live figures for tree and landscaping works decided by Hull in the last twelve months, from validation. Hull decision record →

Public comments

No public comments yet.

Last counted 21 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15315294
Planning Portal ref
PP-15315294
Comments by
3 Dec 2026
Env. assessment
No
Hull
Planning Authority Score
2.6/10
Poor
#248 of 296 overall
Relevant to this application:
Householder decisions

Hull is slower than most councils at deciding householder applications: #231 of 296 on speed. The council extends the time limit on 62% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Hull decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #85 of 296
92%
Householder approved
Above avg (90%) #156 of 296
51%
Decided in 8 weeks
Below avg (63%) #231 of 296
62%
Extended time limit
Above avg (41%) #273 of 296
88%
Minor dwellings approved
16 decided (1-9 homes)
86%
Major dwellings approved
14 decided (10+ homes)
88%
Change of use approved
33 decided
436
Total decisions
36 refused in the year to March 2026