Land At Car Park To Rear Of 206 To 218 Uttoxeter New Road Derby DE22 3JD Data via plota.co.uk

25/01684/TPO - Works to a tree with a TPO Approved

Proposal

Crown reduction to a height of 14m and a spread of 9m, crown lift by 5m and removal of epicormic growth (crown lift and removal of epicormic growth to be carried out every two years for a period of 10 years) of two Lime trees protected by Tree Preservation Order No 170 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 14 Nov 2025
✓
Approved
23 Jan 2026

Approved on 23 Jan 2026 · Delegated Decision · Last checked 9 Oct 2026

Site constraints 4

National infrastructure project about 886 m away: A38 Derby Junctions
The site is about 886 m from the project boundary. Highway, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Registered park or garden about 111 m away: The Old Cemetery, Derby; Inside the Derby built-up area; Air quality management area about 59 m away: Derby NO2 AQMA No.1: Ring Roads.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 2 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Derby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Derby
Application type
Works to a tree with a TPO
Postcode
DE22 3JD
Received
around 14 Nov 2025
Validated
14 Nov 2025
Ward
Abbey Ward
Case officer
Show
Target decision
9 Jan 2026
Decision
Approval
Decision date
23 Jan 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Gristwood and Toms Limited

How this decision compares

Decided in 70 days from validation, 10 days slower than Derby's median of 60 for tree and landscaping works. Approved, as 97% of tree and landscaping works here are.

40%decided within 8 weeks
97%approved
158decided in the last year

Plota live figures for tree and landscaping works decided by Derby in the last twelve months, from validation. Derby decision record →

Public comments

1comment received
1 objecting

Last counted 9 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
26 Dec 2025
Derby
Planning Authority Score
2.2/10
Poor
#266 of 296 overall
Relevant to this application:
Householder decisions

Derby is slower than most councils at deciding householder applications: #253 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Derby decision statistics
Based on MHCLG data, the year to March 2026
91%
Overall approval rate
Above avg (87%) #98 of 296
91%
Householder approved
Above avg (90%) #172 of 296
45%
Decided in 8 weeks
Below avg (63%) #253 of 296
60%
Extended time limit
Above avg (41%) #268 of 296
79%
Minor dwellings approved
47 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
89%
Change of use approved
84 decided
944
Total decisions
87 refused in the year to March 2026