Units 7, 8 And 9 Royal Exchange London EC3V 3LL Data via plota.co.uk

Proposal

Amalgamation of Units 7, 8 and 9 with associated internal and external alterations to facilitate the change of use from retail (Class E) to bar with substantial food offering (Sui Generis). Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Feb 2026
✓
Consultation
23 Feb 2026
✓
Approved
15 May 2026

Approved on 15 May 2026 · Delegated Decision · Last checked 6 Jul 2026

Documents 73

Statements & assessments 17

PDF ACCESS STATEMENT Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR HERITAGE & DECORATIVE ITEMS PLAN Drawing · 8 May 2026 View ↗ PDF ACCESS STATEMENT Superseded drawing · 13 Apr 2026 View ↗ PDF BASEMENT FLOOR HERITAGE & DECORATIVE ITEMS PLAN Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR HERITAGE & DECORATIVE ITEMS PLAN Superseded drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR HERITAGE & DECORATIVE ITEMS PLAN Drawing · 6 Feb 2026 View ↗ PDF 8230_ROYAL EXCHANGE - PLANNING STATEMENT 06.02 Report - Planning Statement/Report · 6 Feb 2026 View ↗ PDF 1_PDFSAM_7_8_9 ROYAL EXCHANGE- DAS REV C.DOCX Report - Design & Access Statement/Report · 6 Feb 2026 View ↗ PDF 5_PDFSAM_7_8_9 ROYAL EXCHANGE- DAS REV C.DOCX Report - Design & Access Statement/Report · 6 Feb 2026 View ↗ PDF 6_PDFSAM_7_8_9 ROYAL EXCHANGE- DAS REV C.DOCX Report - Design & Access Statement/Report · 6 Feb 2026 View ↗ PDF 11_PDFSAM_7_8_9 ROYAL EXCHANGE- DAS REV C.DOCX Report - Design & Access Statement/Report · 6 Feb 2026 View ↗ PDF 12_PDFSAM_7_8_9 ROYAL EXCHANGE- DAS REV C.DOCX Report - Design & Access Statement/Report · 6 Feb 2026 View ↗ PDF 14_PDFSAM_7_8_9 ROYAL EXCHANGE- DAS REV C.DOCX Report - Design & Access Statement/Report · 6 Feb 2026 View ↗ PDF 18_PDFSAM_7_8_9 ROYAL EXCHANGE- DAS REV C.DOCX Report - Design & Access Statement/Report · 6 Feb 2026 View ↗ PDF 1_PDFSAM_8230HER_ROYAL EXCHANGE_HERITAGE STATEMENT_FEB2026 Accompanying report · 6 Feb 2026 View ↗ PDF 13_PDFSAM_8230HER_ROYAL EXCHANGE_HERITAGE STATEMENT_FEB2026 Accompanying report · 6 Feb 2026 View ↗ PDF 6441_PROPOSED ACCESS STATEMENT RATIONALE (1) Other · 6 Feb 2026 View ↗

Plans & drawings 44

PDF GROUND FLOOR REFLECTED CEILING PLAN Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR LICENSING PLAN Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR DEMOLITION PLAN Drawing · 8 May 2026 View ↗ PDF FIRE STRATEGY FIRE STRATEGY PLAN Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR VENTILATION PROPOSAL CONCEPT PLAN Superseded drawing · 8 May 2026 View ↗ PDF GROUND FLOOR VENUE ACCESS PLAN Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR FINISHES PLAN Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR VENTILATION PROPOSAL CONCEPT PLAN Drawing · 8 May 2026 View ↗ PDF GROUND FLOOR VENUE ACCESS PLAN Drawing · 13 Apr 2026 View ↗ PDF GROUND FLOOR VENUE ACCESS PLAN Drawing · 13 Apr 2026 View ↗ PDF BASEMENT FLOOR DEMOLITION PLAN Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR DEMOLITION PLAN Drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR DEMOLITION PLAN Drawing · 6 Feb 2026 View ↗ PDF BASEMENT FLOOR VENTILATION PROPOSAL CONCEPT PLAN Drawing · 6 Feb 2026 View ↗ PDF BASEMENT FLOOR PROPOSED INTERIOR ELEVATIONS Drawing · 6 Feb 2026 View ↗ PDF EXTERNAL ELEVATION EXISTING & PROPOSED Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR PROPOSED INTERIOR ELEVATIONS Superseded drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR PROPOSED INTERIOR ELEVATIONS Drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR PROPOSED INTERIOR ELEVATIONS Drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR PROPOSED INTERIOR ELEVATIONS Drawing · 6 Feb 2026 View ↗ PDF BASEMENT FLOOR EXISTING PLAN Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR EXISTING PLAN Drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR EXISTING PLAN Drawing · 6 Feb 2026 View ↗ PDF BASEMENT FLOOR FINISHES PLAN Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR FINISHES PLAN Superseded drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR FINISHES PLAN Drawing · 6 Feb 2026 View ↗ PDF BASEMENT FLOOR VENTILATION PROPOSAL CONCEPT PLAN Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR VENTILATION PROPOSAL CONCEPT PLAN Superseded drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR VENTILATION PROPOSAL CONCEPT PLAN Drawing · 6 Feb 2026 View ↗ PDF BASEMENT FLOOR GA PROPOSED PLAN Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR DEMOLITION PLAN Superseded drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR GA PROPOSED PLAN Drawing · 6 Feb 2026 View ↗ PDF BASEMENT FLOOR REFLECTED CEILING PLAN Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR REFLECTED CEILING PLAN Superseded drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR REFLECTED CEILING PLAN Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR VENUE ACCESS PLAN Superseded drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR DEMOLITION PLAN Drawing · 6 Feb 2026 View ↗ PDF 6441_L0_002 Site Plan · 6 Feb 2026 View ↗ PDF BASEMENT LEVEL Drawing · 6 Feb 2026 View ↗ PDF GROUND FLOOR LEVEL Drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR LEVEL Drawing · 6 Feb 2026 View ↗ PDF BASEMENT FLOOR FIRE STRATEGY PLAN Drawing · 6 Feb 2026 View ↗ PDF FIRE STRATEGY FIRE STRATEGY PLAN Superseded drawing · 6 Feb 2026 View ↗ PDF FIRST FLOOR FIRE STRATEGY PLAN Drawing · 6 Feb 2026 View ↗

All documents on the council site ↗

Associated applications 2

Site constraints 10

49 listed buildings within 150 m of the postcode pin
Nearest: Royal Exchange, Grade I, the postcode pin is inside its outline · 6 Grade I, 6 Grade II*, 37 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 49 with distances
Historic England ↗
Bank conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: City of London AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 395 m away: Thames Tideway Tunnel
The site is about 395 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 235 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Scheduled monument about 121 m away: Merchant Taylors' Hall
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Inside the City and County of the City of London built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space about 26 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in City of London - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Listed Building Consent
Postcode
EC3V 3LL
Received
6 Feb 2026
Validated
6 Feb 2026
Ward
Cornhill
Case officer
Show
Target decision
3 Apr 2026
Decision
Approved
Decision date
15 May 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Potential Potential Ltd

How this decision compares

Decided in 98 days from validation, 22 days slower than City of London's median of 76 for commercial and major works. Approved, as 100% of commercial and major works here are.

33%decided within 8 weeks
100%approved
29decided in the last year

Plota live figures for commercial and major works decided by City of London in the last twelve months, from validation. City of London decision record →

Consultation & key dates

Alt. reference
PP-14555866
Planning Portal ref
PP-14555866
Consultation
23 Feb 2026
Comments by
24 Mar 2026
Site or press notice
27 Feb 2026
Committee
15 May 2026
Statutory expiry
3 Apr 2026
Env. assessment
No
City of London
Planning Authority Score
6.7/10
Good
#71 of 296 councils
Relevant to this application:
Change of use

City of London is one of the fastest councils in England for householder decisions, ranking #1 out of 296. The council extends the time limit on 84% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are more likely to be approved here than most councils, with a 100% approval rate vs 90% nationally.

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
City of London decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #3 of 296
100%
Householder approved
Above avg (90%) #1 of 296
100%
Decided in 8 weeks
Above avg (63%) #1 of 296
84%
Extended time limit
Above avg (41%) #296 of 296
50%
Minor dwellings approved
4 decided (1-9 homes)
91%
Change of use approved
22 decided
460
Total decisions
14 refused in the year to March 2026