Centre Of Pond 42m From 6 St Marys Walk 42m St Marys Walk Eardisland Herefordshire Data via plota.co.uk

P252258/K - Works to Trees in a Conservation Area Approved

Proposal

T1 - Oak tree, <80ft in height - crown reduction of 20ft in height as tree is to be exposed to windthrow due to works on neighbouring tree. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Aug 2025
✓
Approved
30 Sept 2025

Approved on 30 Sept 2025 · Last checked 14 Oct 2026

Site constraints 6

Scheduled monument: Mound N of the church
Scheduled monument consent is needed for any work to it, separate from planning permission.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
11 listed buildings within 150 m; Radon affected area, class 3.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 1 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Works to Trees in a Conservation Area
Received
7 Aug 2025
Validated
7 Aug 2025
Ward
Arrow
Parish
Eardisland
Target decision
18 Sept 2025
Decision
Trees in Cons Area Works Can Proceed
Decision date
30 Sept 2025

How this decision compares

Decided in 54 days from validation, 17 days slower than Herefordshire's median of 37 for tree and landscaping works. Approved, as 95% of tree and landscaping works here are.

96%decided within 8 weeks
95%approved
502decided in the last year

Plota live figures for tree and landscaping works decided by Herefordshire in the last twelve months, from validation. Herefordshire decision record →

Consultation & key dates

Consultation
11 Aug 2025
Comments by
2 Sept 2025
Site or press notice
11 Aug 2025
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 overall
Relevant to this application:
Other decisions

Herefordshire is slower than most councils at deciding householder applications: #250 of 296 on speed. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026