3, HSBC, Cathedral Square, Peterborough, PE1 1XL Data via plota.co.uk

26/002395/FUL - Planning Application (Full) Approved

Proposal

Replacement of principal entrance doors Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jun 2026
✓
Consultation
19 Jun 2026
✓
Approved
14 Jul 2026

Approved on 14 Jul 2026 · Delegated Decision (Officer) · Last checked 17 Jul 2026

Site constraints 13

Great Crested Newt Risk ZonesCIL Charge ZonesSSSI Buffer ZoneRamsar wetlandCity Centre LP5
Grade II listed: Midland Bank, 1 and 3, Cathedral Square and 2 Bridge Street
List entry 1126951 · The pin is inside its outline · 45 more listed buildings within 150 m (9 Grade I, 1 Grade II*, 32 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 45 with distances
Historic England ↗
City Centre Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Scheduled monument 41 m away: Peterborough Cathedral Precincts, including Table Hall and Infirmary Arcade
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Registered park or garden 57 m away: Peterborough Cathedral Precincts
Its setting is a consideration for work nearby.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Great Crested Newt Risk ZonesCouncil record
Recorded by the council for this site.
Council site ↗
CIL Charge ZonesCouncil record
Recorded by the council for this site.
Council site ↗
SSSI Buffer ZoneCouncil record
Recorded by the council for this site.
Council site ↗
Ramsar wetlandCouncil record
Recorded by the council for this site.
Council site ↗
City Centre LP5Council record
Recorded by the council for this site.
Council site ↗
Also on the record
Nature improvement area: Nene Valley; Heritage at risk 41 m away: Peterborough Cathedral precinct wall, Peterborough; Inside the Peterborough built-up area; National infrastructure project 1927 m away: Fens Reservoir, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area920 m² (9,903 sq ft)
Energy ratingD (asset rating 93)
UseRetail/Financial and Professional Services
HeatingAir Conditioning

From the energy performance certificate lodged in June 2025, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Peterborough - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Planning Application (Full)
Postcode
PE1 1XL
Received
1 Jun 2026
Validated
1 Jun 2026
Ward
Central
Case officer
Show
Target decision
26 Jul 2026
Decision
Permitted
Decision date
14 Jul 2026
Decision level
Delegated Decision (Officer)
Applicant
Show
Agent
AXIS Architecture
Leaseholder
Show

How this decision compares

Decided in 43 days from validation, 12 days faster than Peterborough's median of 55 for extensions. Approved, as 87% of extensions here are.

65%decided within 8 weeks
87%approved
331decided in the last year

Plota live figures for extensions decided by Peterborough in the last twelve months, from validation. Peterborough decision record →

Consultation & key dates

Alt. reference
PP-14840041
Comments by
1 Jul 2026
Site or press notice
11 Jun 2026
Statutory expiry
28 Jun 2026
Peterborough
Planning Authority Score
5.2/10
Average
#139 of 296 councils
Relevant to this application:
Householder decisions

Peterborough ranks #141 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Peterborough decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #240 of 296
89%
Householder approved
Below avg (90%) #206 of 296
67%
Decided in 8 weeks
Above avg (63%) #141 of 296
33%
Extended time limit
Below avg (41%) #80 of 296
67%
Minor dwellings approved
42 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
60%
Change of use approved
80 decided
665
Total decisions
115 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.