Church Road Car Park rear of 189-203, Church Road, London Data via plota.co.uk

26/0346 - Conditions pursuant to a full permission Approved

Proposal

Details pursuant to condition 33 (remediation strategy) of Variation of Conditions reference dated 31 March, 2023, for Variation of condition 2 (approved drawings and documents), condition 4 (wheelchair accessible units), and condition 18 (CHP details) of full planning permission reference dated 10 February 2017, for Demolition of 205 Church Road and proposal of new market square to replace Eric Road. Demolition of 3 storey building to the rear of 203 Church Road and proposal of 34 residential dwellings and ground floor non-residential space (class A1/A3/B1/D1). Stopping up of Eric Road as revised by plans. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
13 Feb 2026
Approved
3 Jul 2026

Approved on 3 Jul 2026 · Delegated Team Manager · Last checked 7 Jul 2026

Associated applications 9

Site constraints 5

Metropolitan Open Land
Green belt level protection inside London.
The London Plan gives Metropolitan Open Land the same protection as green belt: inappropriate development needs very special circumstances.
Churchfields conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Also on the record
Inside the Ealing built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Brent - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Brent
Application type
Conditions pursuant to a full permission
Postcode
W7 3BZ
Received
13 Feb 2026
Validated
13 Feb 2026
Ward
Roundwood
Case officer
Show
Decision
Permission Granted
Decision date
3 Jul 2026
Decision level
Delegated Team Manager
Applicant
Show
Agent
Jones Lang LaSalle

Consultation & key dates

Alt. reference
PP-14686184
Comments by
24 Mar 2026
Env. assessment
No
Brent
Planning Authority Score
5.7/10
Average
#113 of 296 councils
Relevant to this application:
Householder decisions

Brent is faster than most councils at deciding householder applications, ranking #91 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (85%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Brent decision statistics
Based on MHCLG data, the year to March 2026
78%
Overall approval rate
Below avg (87%) #269 of 296
85%
Householder approved
Below avg (90%) #247 of 296
73%
Decided in 8 weeks
Above avg (63%) #91 of 296
28%
Extended time limit
Below avg (41%) #42 of 296
53%
Minor dwellings approved
73 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
54%
Change of use approved
193 decided
1,963
Total decisions
431 refused in the year to March 2026