St Josephs Catholic Primary School, Dartmouth Park Hill, London, N19 5DT Data via plota.co.uk

P2026/1124/TRE - Works application to tree with Tree Preservation Order Approved

Proposal

TPO application: 8 x Poplars (T6 to T14): any roots found within the upper 230mm of sub-base to be removed and replaced shall be severed. s211 notice: Sycamore (G2): any roots found within the upper 230mm of sub-base to be removed and replaced shall be severed. See accompanying reports for further details. Final Justification for Works The proposed works are required to address significant and ongoing damage to the existing tarmac playground at St Joseph’s Primary School. As set out within the submitted Arboricultural Report and Tree Works Plan, the deterioration has been caused by a combination of seasonal soil movement linked to water uptake by retained trees and the presence of shallow roots beneath the existing surfacing. This has resulted in lifting, cracking, and displacement of the tarmac, creating an uneven surface across the primary play area. The condition presents a clear trip hazard to pupils and staff and constitutes a health and safety concern. Given the constrained nature of the site and the limited availability of alternative outdoor space, the usability of the playground is now being compromised, impacting the day-to-day operation of the school. Investigations, including trial trenches, confirmed the presence of surface roots, although the majority of the tree root systems are located deeper than the existing construction. The proposed works therefore seek to address the damaged surfacing while minimising harm to the retained trees. The scheme involves reconstruction of the playground using a reduced excavation depth of approximately 230mm, with all works within Root Protection Areas undertaken carefully using hand tools and under arboricultural supervision. Any roots encountered within this upper layer will be cleanly pruned in accordance with best practice, avoiding unnecessary disturbance to deeper rooting structures. The introduction of a cellular confinement (crate) system within the new build-up is designed to provide a stable, load-distributing surface that reduces the likelihood of future damage, thereby supporting both the long-term usability of the playground and the continued retention of the protected trees. Overall, the works are considered necessary to resolve an existing safety issue while adopting a methodology that minimises impact on the protected trees and accords with arboricultural guidance. Data via plota.co.uk

View original council record ↗

Application progress

Received
29 May 2026
Approved
16 Jul 2026

Approved on 16 Jul 2026 · Delegated · Last checked 17 Jul 2026

Important details

Council
Islington
Application type
Works application to tree with Tree Preservation Order
Postcode
N19 5DT
Received
29 May 2026
Validated
29 May 2026
Ward
Junction
Case officer
Show
Target decision
23 Jul 2026
Decision
Approve with conditions
Decision date
16 Jul 2026
Decision level
Delegated
Applicant
Show

Consultation & key dates

Alt. reference
PP-14888379
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 councils
Relevant to this application:
Householder decisions

Islington is slower than most councils at deciding householder applications, ranking #260 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision performance
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026