PA/26/00864/NC - Full Planning Permission Approved

Proposal

The proposal is to decarbonise Poplar Fire Station while renewing aging or unserviceable systems. The main components of this project are: - Replacement of Heating and Domestic Hot Water Central Plant with Air Sourced Heat Pumps (ASHPs) located on the roof; - Installation of roof insulation and raising roof parapet by 250mm to accommodate the increased roof insulation; - Relocating existing solar PV panels on the roof to accommodate the new ASHPs. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
21 May 2026
Consultation
29 May 2026
Approved
10 Aug 2026

Approved on 10 Aug 2026 · Delegated · Last checked 11 Aug 2026

Documents 22

All documents on the council site ↗

Site constraints 8

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Archaeological priority area: Tower Hamlets APA 2.16
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Tower Hamlets AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Chrisp Street
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
4 listed buildings within 150 m
Nearest: Statue of Richard Green (in Front of Public Baths), Grade II, 41 m away · 1 Grade II*, 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Conservation area 17 m away: Lansbury
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
Inside the Tower Hamlets built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tower Hamlets - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
E14 0BP
Received
21 May 2026
Validated
21 May 2026
Ward
Poplar
Case officer
Show
Decision
Permit
Decision date
10 Aug 2026
Decision level
Delegated
Applicant
Show
Agent
McBains

How this decision compares

Decided in 81 days from validation, 25 days slower than Tower Hamlets's median of 56 for utility and infrastructure works. Approved, as 85% of utility and infrastructure works here are.

79%decided within 8 weeks
85%approved
34decided in the last year

Plota live figures for utility and infrastructure works decided by Tower Hamlets in the last twelve months, from validation. Tower Hamlets decision record →

Consultation & key dates

Neighbours
29 May 2026
Comments by
13 Jul 2026
Site or press notice
22 Jun 2026
Env. assessment
No
Tower Hamlets
Planning Authority Score
3.9/10
Below average
#201 of 296 councils
Relevant to this application:
Householder decisions

Tower Hamlets is slower than most councils at deciding householder applications, ranking #207 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Tower Hamlets decision statistics
Based on MHCLG data, the year to March 2026
84%
Overall approval rate
Below avg (87%) #229 of 296
92%
Householder approved
Above avg (90%) #167 of 296
56%
Decided in 8 weeks
Below avg (63%) #207 of 296
42%
Extended time limit
Above avg (41%) #167 of 296
63%
Minor dwellings approved
52 decided (1-9 homes)
80%
Major dwellings approved
15 decided (10+ homes)
55%
Change of use approved
67 decided
998
Total decisions
164 refused in the year to March 2026