ERYL MÔR HOTEL, 2 Upper Garth Road, Bangor, Gwynedd, LL57 2SR Data via plota.co.uk

C26/0675/11/LL - Full Planning In Progress

Proposal

Cais ôl weithredol er mwyn gosod system echdynnu newydd. Retrospective application for the installation of a new extraction system. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Nov 2026
Decision
Expected by 29 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 1 Mar 2027 and 13 Apr 2027, from Gwynedd's recent utility and infrastructure works.

Comments are open until 7 Dec 2026

Comment on this application ↗

Site constraints 4

Special area of conservation 165 m away: Y Fenai a Bae Conwy / Menai Strait and Conwy Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 162 m away: Coedydd Afon Menai
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
5 listed buildings within 150 m; Radon affected area, class 4.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 13 November 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area503 m² (5,414 sq ft)
Energy ratingC (asset rating 63)
UseC1 Hotels
HeatingHeating and Natural Ventilation

From the energy performance certificate lodged in November 2019, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Gwynedd - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Gwynedd
Application type
Full Planning
Postcode
LL57 2SR
Received
3 Nov 2026
Validated
3 Nov 2026
Ward
Canol Bangor
Parish
Bangor
Case officer
Show
Target decision
29 Dec 2026
Decision level
Dirprwyedig / Delegated
Applicant
Show
Freehold owner
Show

Decision outlook

Day 15 of the 56-day target. Gwynedd usually decides utility and infrastructure works by day 133.

Day 15118 days to the predicted decision (day 133)
10%decided within 8 weeks
84%approved
19%go to committee

Plota live figures for utility and infrastructure works decided by Gwynedd in the last twelve months, from validation. Gwynedd decision record →

Consultation & key dates

Comments by
7 Dec 2026
Statutory expiry
29 Dec 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.