Four Oaks Barn, Cocks Lane, Warfield, Bracknell, RG42 6JE Data via plota.co.uk

PA/2026/0255 - Full planning permission Approved

Proposal

Full (part retrospective) planning application for the temporary retention of telecommunications infrastructure at Four Oaks Barn, comprising a 24-metre-high lattice communications mast and associated ancillary equipment, for a period of three years. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
27 Feb 2026
✓
Validated
26 Mar 2026
✓
Approved
1 Jul 2026

Approved on 1 Jul 2026 · Delegated Decision · Last checked 23 Aug 2026

Site constraints 4

Green belt: London
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Winkfield Street built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 3 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bracknell Forest - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full planning permission
Postcode
RG42 6JE
Received
27 Feb 2026
Validated
26 Mar 2026
Ward
Winkfield and Warfield East
Parish
Warfield Parish Council
Case officer
Show
Target decision
2 Jul 2026
Decision
Approve with Conditions
Decision date
1 Jul 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 97 days from validation, 25 days slower than Bracknell Forest's median of 72 for full applications. Approved, as 88% of full applications here are.

31%decided within 8 weeks
88%approved
253decided in the last year

Plota live figures for full applications decided by Bracknell Forest in the last twelve months, from validation. Bracknell Forest decision record →

Public comments

3comments received
3 objecting

100% object · above the UK average of 74%

Last counted 23 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
17 Apr 2026
Bracknell Forest
Planning Authority Score
2.4/10
Poor
#254 of 296 overall
Relevant to this application:
Householder decisions

Bracknell Forest is one of the slowest councils in England for householder decisions: #269 of 296 on speed. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Bracknell Forest decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #125 of 296
92%
Householder approved
Above avg (90%) #147 of 296
38%
Decided in 8 weeks
Below avg (63%) #269 of 296
59%
Extended time limit
Above avg (41%) #263 of 296
81%
Minor dwellings approved
26 decided (1-9 homes)
79%
Major dwellings approved
14 decided (10+ homes)
83%
Change of use approved
30 decided
502
Total decisions
53 refused in the year to March 2026