Southsea Seafront From Long Curtain Moat In The West To Eastney Marine Barracks In The East. Data via plota.co.uk

26/00579/LBC - Listed Building Consent Approved

Proposal

Removal and re positioning of 16no. Grade II Listed lamp columns along the seafront Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 May 2026
✓
Validated
11 May 2026
✓
Consultation
28 May 2026
✓
Approved
20 Aug 2026

Approved on 20 Aug 2026 · Committee Decision · Last checked 23 Aug 2026

Planning committee

Decided by Portsmouth Planning Committee on 19 Aug 2026.

Approved

As officers recommended.

  • Officers recommended conditional approval because the works would cause limited heritage harm while supporting the wider sea defence scheme.
  • One comment concerned reinstating a 20mph speed limit, which was addressed under the related application.
  • Members granted conditional Listed Building Consent after discussing the new lamp columns and energy-saving LED bulbs.
Read how the committee decided The proposal, site history, officers’ assessment, consultation responses, member discussion and committee decision. Includes the meeting recording, from 0:09:12 where this application was taken

Source: Plota analysis of Portsmouth's committee minutes of 19 Aug 2026.

Documents 28

All documents on the council site ↗

Site constraints 4

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 434 m away: AQUIND Interconnector
The site is about 434 m from the project boundary. Electricity line, awaiting the Secretary of State's decision. Also within 2 km: Hampshire Water Transfer and Water Recycling Project (accepted for examination, about 595 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Portsmouth built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 3 November 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Portsmouth - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Portsmouth
Application type
Listed Building Consent
Postcode
PO4 9PP
Received
8 May 2026
Validated
11 May 2026
Ward
St Thomas
Case officer
Show
Target decision
6 Jul 2026
Decision
Conditional Consent
Decision date
20 Aug 2026
Decision level
Committee Decision
Applicant
Show

How this decision compares

Decided in 101 days from validation, about the council's usual 101 days. Approved, as 87% of listed building works here are.

26%decided within 8 weeks
87%approved
13%go to committee

Plota live figures for listed building works decided by Portsmouth in the last twelve months, from validation. Portsmouth decision record →

Public comments

1comment received
1 neutral

334 neighbours consulted · Last counted 23 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14881788
Planning Portal ref
PP-14881788
Neighbours
28 May 2026
Consultation
28 May 2026
Comments by
19 Jun 2026
Site or press notice
29 May 2026
Committee
19 Aug 2026
Statutory expiry
6 Jul 2026
Env. assessment
No
Portsmouth
Planning Authority Score
3.1/10
Poor
#232 of 296 councils
Relevant to this application:
Other decisions

Portsmouth ranks #188 out of 296 councils for householder decision speed. 48% of applications have the time limit extended, above the 41% national average. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Portsmouth decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #196 of 296
89%
Householder approved
Below avg (90%) #207 of 296
60%
Decided in 8 weeks
Below avg (63%) #188 of 296
48%
Extended time limit
Above avg (41%) #217 of 296
61%
Minor dwellings approved
44 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
77%
Change of use approved
99 decided
613
Total decisions
85 refused in the year to March 2026