Broadgate Quarter, 9 Appold Street And 1 Snowden Street, London , EC2A 2AW Data via plota.co.uk

2026/0990 - Full Planning Permission Approved

Proposal

Refurbishment of Level 07 and 09 terraces, including the installation of replacement balustrades and access doors, lighting, planting, and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 May 2026
✓
Approved
14 Jul 2026

Approved on 14 Jul 2026 · Delegated · Last checked 1 Oct 2026

Documents 22

All documents on the council site ↗

Site constraints 14

3 Article 4 directions
Whole of the London Borough of Hackney · Exemption Area (part 1) · Hackney Central Activity Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Shoreditch
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project about 1249 m away: Thames Tideway Tunnel; Wider setting of protected view 8A.1 Westminster Pier to St Paul's Cathedral; Conservation area about 55 m away: Sun Street; Scheduled monument about 226 m away: Priory and Hospital of St Mary Spital; Heritage at risk about 54 m away: Sun Street, City of London; 3 listed buildings within 150 m of the postcode pin; Inside the Hackney built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Full Planning Permission
Postcode
EC2A 2AW
Received
8 May 2026
Validated
8 May 2026
Ward
Hoxton East and Shoreditch Ward
Case officer
Show
Target decision
14 Jul 2026
Decision
Grant
Decision date
14 Jul 2026
Decision level
Delegated
Applicant
Show
Agent
CBRE Ltd

How this decision compares

Decided in 67 days from validation, 24 days faster than Hackney's median of 91 for commercial and major works. Approved, as 78% of commercial and major works here are.

19%decided within 8 weeks
78%approved
8%go to committee

Plota live figures for commercial and major works decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
14 Jul 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 councils
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications, ranking #220 out of 296. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026