BAVARIA HOUSE, 13 - 14 Appold Street, Hackney, London, EC2A 2NB Data via plota.co.uk

2026/1663 - Scoping Opinion Pending

Proposal

Request for a Scoping Opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment Regulations 2017) relating to a proposal for the demolition of the existing Bavaria House (including existing basement) and the construction of a hotel tower to provide the following: • Hotel (Use Class C1); • Total floorspace of approximately 34,295m2 (Gross Internal Area (GIA)); • Extensive public realm enhancements including hard and soft landscaping; and • Proposed basement extension. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Jul 2026
Decision
Expected by 3 Sept 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 13 Oct 2026 and 7 Dec 2026, from Hackney's recent commercial and major works.

Site constraints 15

3 Article 4 directions
Whole of the London Borough of Hackney · Exemption Area (part 1) · Hackney Central Activity Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Hackney AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Shoreditch
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Conservation area 23 m away: Sun Street
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
National infrastructure project 1229 m away: Thames Tideway Tunnel; Heritage at risk 22 m away: Sun Street, City of London; Wider setting of protected view 8A.1 Westminster Pier to St Paul's Cathedral; 2 listed buildings within 150 m; Scheduled monument 246 m away: Priory and Hospital of St Mary Spital; Inside the Hackney built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square; Designated open space 32 m away.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Hackney - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Hackney
Application type
Scoping Opinion
Postcode
EC2A 2NB
Received
30 Jul 2026
Validated
30 Jul 2026
Ward
Hoxton East and Shoreditch Ward
Case officer
Show
Target decision
3 Sept 2026
Decision level
Delegated
Applicant
Show
Agent
DP9 Ltd

Decision outlook

Day 70 of the 56-day target. Hackney usually decides commercial and major works by day 91.

Day 7021 days to the predicted decision (day 91)
19%decided within 8 weeks
78%approved
8%go to committee

Plota live figures for commercial and major works decided by Hackney in the last twelve months, from validation. Hackney decision record →

Consultation & key dates

Statutory expiry
3 Sept 2026
Hackney
Planning Authority Score
2.4/10
Poor
#256 of 296 councils
Relevant to this application:
Householder decisions

Hackney is slower than most councils at deciding householder applications, ranking #220 out of 296. Hackney is also one of the strictest councils - it refuses more householder applications than almost any other, with only 84% approved vs 90% nationally.

One of the strictest councils
only 84% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Hackney decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #248 of 296
84%
Householder approved
Below avg (90%) #257 of 296
53%
Decided in 8 weeks
Below avg (63%) #220 of 296
46%
Extended time limit
Above avg (41%) #201 of 296
75%
Minor dwellings approved
204 decided (1-9 homes)
100%
Major dwellings approved
4 decided (10+ homes)
50%
Change of use approved
2 decided
1,323
Total decisions
241 refused in the year to March 2026