Morrisons Petrol Filling Station , Bakewell Road , Buxton , Derbyshire , SK17 9TB Data via plota.co.uk

DOC/2026/0073 - Discharge of conditions Consultations/Re-consultations issued

Proposal

Discharge of conditions 7 & 16 relating to HPK/2025/0457 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
11 Sept 2026
Decision
Expected by 6 Nov 2026

Under consideration

No decision has been issued yet. A decision is expected by 6 Nov 2026.

The consultation period closed on 9 Oct 2026.

Associated applications 2

Site constraints 5

Nutrient neutrality catchment: Peak District Dales SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
Inside the Buxton (High Peak) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in High Peak - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
High Peak
Application type
Discharge of conditions
Postcode
SK17 9TB
Received
11 Sept 2026
Validated
11 Sept 2026
Case officer
Show
Target decision
6 Nov 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Lloyd (JMS Planning & Development)

Consultation & key dates

Comments by
9 Oct 2026
High Peak
Planning Authority Score
1.2/10
Poor
#287 of 296 councils
Relevant to this application:
Householder decisions

High Peak is one of the slowest councils in England for householder decisions, ranking #284 out of 296. The council extends the time limit on 73% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (89%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
High Peak decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #207 of 296
89%
Householder approved
Below avg (90%) #204 of 296
29%
Decided in 8 weeks
Below avg (63%) #284 of 296
73%
Extended time limit
Above avg (41%) #291 of 296
78%
Minor dwellings approved
32 decided (1-9 homes)
80%
Major dwellings approved
5 decided (10+ homes)
89%
Change of use approved
18 decided
364
Total decisions
55 refused in the year to March 2026