Topsham Level Crossing Station Road Topsham Data via plota.co.uk

26/1240/CAT - Works to Trees in a Conservation Area Pending Consideration

Proposal

Subject Alder tree is located on the Southern edge of platform 2. The tree itself appears healthy but has a lean towards the track. The tree is growing on a 1m wide ledge in-between the edge of the platform and Holman way. Proposed works will see to the controlled fell and removal of the tree using climbing and lowering operations - GWR to advise. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
14 Aug 2026
✓
Validated
12 Oct 2026
Decision
Expected by 23 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 29 Nov 2026 and 8 Dec 2026, from Exeter's recent demolitions.

Site constraints 7

Grade II listed: Signal Box
List entry 1224484 · 14 m away · 2 more listed buildings within 150 m (2 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 2 with distances
Historic England ↗
Public footpath 23 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Conservation area 0 m away: Topsham
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Special protection area 381 m away: Exe Estuary; SSSI 381 m away: Exe Estuary SSSI; Inside the Topsham built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 20 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Exeter - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Exeter
Application type
Works to Trees in a Conservation Area
Received
14 Aug 2026
Validated
12 Oct 2026
Case officer
Show
Target decision
23 Nov 2026
Applicant
Show

Decision outlook

Day 42 of the 56-day target. Exeter usually decides demolitions by day 55.

Day 4214 days to the 56-day target
59%decided within 8 weeks
80%approved
44decided in the last year

Plota live figures for demolitions decided by Exeter in the last twelve months, from validation. Exeter decision record →

Public comments

No public comments yet.

Last counted 22 Nov 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15160097
Planning Portal ref
PP-15160097
Statutory expiry
23 Nov 2026
Env. assessment
No
Exeter
Planning Authority Score
3.2/10
Poor
#228 of 296 overall
Relevant to this application:
Other decisions

Exeter is slower than most councils at deciding householder applications: #214 of 296 on speed. Householder applications are slightly less likely to be approved here (86%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Exeter decision statistics
Based on MHCLG data, the year to March 2026
85%
Overall approval rate
Below avg (87%) #205 of 296
86%
Householder approved
Below avg (90%) #242 of 296
54%
Decided in 8 weeks
Below avg (63%) #214 of 296
40%
Extended time limit
Below avg (41%) #150 of 296
58%
Minor dwellings approved
31 decided (1-9 homes)
60%
Major dwellings approved
5 decided (10+ homes)
90%
Change of use approved
40 decided
582
Total decisions
86 refused in the year to March 2026