29 Dymchurch Road, St Marys Bay, Romney Marsh, TN29 0HF Data via plota.co.uk

25/2052/FH - Works to Trees covered by a TPO Approved

Proposal

Works to trees comprising of TPO No 10 of 2007 comprising of T1 Cedar reduce by 2 metres in height and laterally, and raise over road to 5.2 metres. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Nov 2025
✓
Approved
5 Dec 2025

Approved on 5 Dec 2025 · Last checked 8 Oct 2026

Site constraints 7

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
SSSI 31 m away: Rye Harbour SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Ramsar wetland 233 m away: Dungeness, Romney Marsh and Rye Bay
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Designation record ↗
Also on the record
Inside the St Mary's Bay built-up area; Priority habitat 37 m away: Coastal sand dunes; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 2 November 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area148 m² (1,593 sq ft)
Energy ratingC (72 out of 100)
PropertyDetached house, 7 habitable rooms
Built1996 to 2002
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, insulated (assumed)

From the energy performance certificate lodged in October 2025, the latest held for this property, matched to this application by its address. The building may have changed since. View the certificate

Work with planning data?

Every application in Shepway - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Shepway
Application type
Works to Trees covered by a TPO
Postcode
TN29 0HF
Received
6 Nov 2025
Validated
6 Nov 2025
Ward
Romney Marsh
Parish
St. Mary in the Marsh
Case officer
Show
Target decision
1 Jan 2026
Decision
Approve with Conditions
Decision date
5 Dec 2025
Freehold owner
Show

How this decision compares

Decided in 29 days from validation, about the council's usual 32 days. Approved, as 93% of tree and landscaping works here are.

100%decided within 8 weeks
93%approved
218decided in the last year

Plota live figures for tree and landscaping works decided by Shepway in the last twelve months, from validation. Shepway decision record →

Public comments

No public comments yet.

Last counted 8 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
28 Nov 2025
Shepway
Planning Authority Score
7.4/10
Good
#49 of 296 overall
Relevant to this application:
Householder decisions

Shepway is one of the fastest councils in England for householder decisions: #5 of 296 on speed. Only 12% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Shepway decision statistics
Based on MHCLG data, the year to March 2026
82%
Overall approval rate
Below avg (87%) #247 of 296
88%
Householder approved
Below avg (90%) #219 of 296
96%
Decided in 8 weeks
Above avg (63%) #5 of 296
12%
Extended time limit
Below avg (41%) #5 of 296
61%
Minor dwellings approved
95 decided (1-9 homes)
100%
Major dwellings approved
13 decided (10+ homes)
69%
Change of use approved
32 decided
761
Total decisions
139 refused in the year to March 2026

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.

Freehold owner and leaseholders: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.